Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Date Description Inspector Results Comments
06/17/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Re-inspection required 6/17/25: TRUSS LAYOUT NOT PER PLAN, Bracing at truss not per plan, roof sheathing was not checked due to truss layout being incorrect, shear wall truss connection not per plan throughout, interior non-load bearing wall truss connection not per plan, anchor bolts shall not be closer than 4" to edge of sill plate and shall not be further than 12" from edge of sill plate, MASA clips shall be no closer than 4" from edge of sill plate and shall be no further than 12" from edge of sill plate, sill plates larger than 12'' require 2 anchor bolts, fasteners at shear wall not spaced per plan and are over penetrating thermoply (throughout), anchor bolts spacing not per approved plans at interior load bearing walls at entry, gabel and bracing not per plan, shot pins required throughout. ALL TRADES SHALL NOT BE BEGINNING WORK PRIOR TO INSPECTION BEING CONDUCTED/ COMPLETE, PLEASE RECALL INSPECTION AFTER TRADES HAVE REMOVED ALL MATERIAL,
06/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Canceled 6/17/25: TRUSS LAYOUT NOT PER PLAN, Bracing at truss not per plan, roof sheathing was not checked due to truss layout being incorrect, shear wall truss connection not per plan throughout, interior non-load bearing wall truss connection not per plan, anchor bolts shall not be closer than 4" to edge of sill plate and shall not be further than 12" from edge of sill plate, MASA clips shall be no closer than 4" from edge of sill plate and shall be no further than 12" from edge of sill plate, sill plates larger than 12'' require 2 anchor bolts, fasteners at shear wall not spaced per plan and are over penetrating thermoply (throughout), anchor bolts spacing not per approved plans at interior load bearing walls at entry, gabel and bracing not per plan, shot pins required throughout. ALL TRADES SHALL NOT BE BEGINNING WORK PRIOR TO INSPECTION BEING CONDUCTED/ COMPLETE, PLEASE RECALL INSPECTION AFTER TRADES HAVE REMOVED ALL MATERIAL,
6/20/25: canceled per OMAR
06/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Re-inspection required (with fee) 6/24/2025 per previous notes. Trades in home continuing without approval.
06/26/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Re-inspection required 6/26/2025. Provide truss calcs at time of inspection to verify if the layout has been changed. Titian's throughout have been hammered in place. Gable ends are not per the details. Cat walk is incomplete. Stopped inspection
06/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6/27/2025 approved per new truss layout per engineered fix. All other items have been completed. Cat walk is still incomplete but due to the distance to the appliance it's going to be ready by intermediate.