Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Backwater Valve
| Date |
Description |
Inspector |
Results |
Comments |
| 05/20/2025 |
COT - RSPL - Backwater Valve |
|
Re-inspection required |
5-20-25, not ready. Per P2604.1 of the IRC, trenches shall be free of debris, rocks, loose dirt. Rocky unstable soil shall be over-excavated by two or more pipe diameters and brought to the proper grade with suitable compacted granular material. |
| 05/21/2025 |
COT - RSPL - Backwater Valve |
|
Re-inspection required |
5-21-25, underground plumbing & backer water valve verified per plans. However, trench shall be free of debris, rocks, loose dirt, and all plumbing joints must be visible. Rocky unstable soil shall be over excavated by two pipe diameters and brought to grade with suitable compacted granular material. See P2604.1 of the IRC. |
| 05/22/2025 |
COT - RSPL - Backwater Valve |
|
Passed |
5-22-25: backwater valve verified per plans. |