Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof Nailing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | COT - RSBU - Roof Nailing | Re-inspection required | 6/17/25: TRUSS LAYOUT NOT PER PLAN, Bracing at truss not per plan, roof sheathing was not checked due to truss layout being incorrect, shear wall truss connection not per plan throughout, interior non-load bearing wall truss connection not per plan, anchor bolts shall not be closer than 4" to edge of sill plate and shall not be further than 12" from edge of sill plate, MASA clips shall be no closer than 4" from edge of sill plate and shall be no further than 12" from edge of sill plate, sill plates larger than 12'' require 2 anchor bolts, fasteners at shear wall not spaced per plan and are over penetrating thermoply (throughout), anchor bolts spacing not per approved plans at interior load bearing walls at entry, gabel and bracing not per plan, shot pins required throughout. ALL TRADES SHALL NOT BE BEGINNING WORK PRIOR TO INSPECTION BEING CONDUCTED/ COMPLETE, PLEASE RECALL INSPECTION AFTER TRADES HAVE REMOVED ALL MATERIAL, | |
| 06/20/2025 | COT - RSBU - Roof Nailing | Re-inspection required | 6/17/25: TRUSS LAYOUT NOT PER PLAN, Bracing at truss not per plan, roof sheathing was not checked due to truss layout being incorrect, shear wall truss connection not per plan throughout, interior non-load bearing wall truss connection not per plan, anchor bolts shall not be closer than 4" to edge of sill plate and shall not be further than 12" from edge of sill plate, MASA clips shall be no closer than 4" from edge of sill plate and shall be no further than 12" from edge of sill plate, sill plates larger than 12'' require 2 anchor bolts, fasteners at shear wall not spaced per plan and are over penetrating thermoply (throughout), anchor bolts spacing not per approved plans at interior load bearing walls at entry, gabel and bracing not per plan, shot pins required throughout. ALL TRADES SHALL NOT BE BEGINNING WORK PRIOR TO INSPECTION BEING CONDUCTED/ COMPLETE, PLEASE RECALL INSPECTION AFTER TRADES HAVE REMOVED ALL MATERIAL, 6/20/25: loose panels at marked locations |
|
| 06/23/2025 | COT - RSBU - Roof Nailing | Passed | 6/23/2025. Approved. Corrections were made. |