Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6137 E FALCONRY TR
Apply Date:
05/01/2024
Applicant:
Alonzo Martinez
Description:
Blackhawk H30A Model Plan

Permit Reviews

Permit Number - TC-MDP-0524-00565
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date Submittal Complete Date Status  
05/02/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/13/2024 APPROVED Review Details
06/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/25/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00565
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 1
Date Name
05/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0524-00565
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date Description Comments
05/14/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
05/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/01/2024 Post-Tension Inspection Report is required.
05/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/08/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/08/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00565
Permite Description: Blackhawk H30A Model Plan
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
05/12/2025 COT - RSEL - Electrical Underground N/A Not Applicable
05/12/2025 BULD - Electrical Clearance N/A Re-inspection required Ground rods not set, missing address label
06/16/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 6-16-25: see previous notes related to
06/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 6-13-25: firefoam chutes at garage, seal penetrations t-ply throughout, DWV not under test, tears on flex at kitchen area, block register on 3 sides at master bedroom, 12" clearance is required between pex and lights-block using osb, drywall, 2x4, plywood, block open space above a/c whip on east side of family room..
6-16-25: shower not under test, firefoam garage chutes, staple awg within 12" of exiting coach light at garage chute, seal vapor barrier behind garage chute, add 1 "staples to t-ply at garage 3"o.c. at edges and in the field, block any pex within 12" of any lights using osb, plywood, 2x4's, or drywall.
6/18/25: staple romex within 12" of box, seal all penetrations through vapor barrier. Shear wall fasteners not per plan and shall be no closer than 3/8" from edge, nail plates at rough-ins with 1 1/4" of face of 2x.
06/18/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 5-27-25, add anchor bolts at marked locations, staple T-ply at upstairs south wall at base, add nails sill to decking at marked locations, make corrections to T-ply located at west wall, add shot pins to marked locations and nails to roof sheathing at southwest location.
6-4-25: correct blocking /sheathing along east side of garage by properly nailing to framing and install HTT5 at entry of southeast corner of garage. NOTE; Framing reinspect but home already lathed.
6-13-25: add blocking behind t-ply at garage and staple 3" o.c.. throughout, add blocking above a/c whip on eastside of family room and reschedule when ready.Submit a letter to the city for review/approval documenting that exterior clips/sheathing was done per plans and meets the 2018 IRC.
6-16-25: add 1 "staples to t-ply at garage 3"o.c. at edges and in the field.
6/18/25: Shear wall fasteners not per plan and shall be no closer than 3/8" from edge.
07/07/2025 COT - RSBU - Interior Shear Bracing N/A Re-inspection required 7-7-25: screws shall be no closer than 3/8" from edges/joints and cannot penetrate more than 1/16". Add screws along base of drywall throughout and screws using listed above Information/details.
09/10/2025 COT - RSEL - Electrical Final N/A Re-inspection required 9.10.25
Garage must be on separate circuit
09/10/2025 RSBU - Building Final N/A Re-inspection required 9.10.25
Garage must be on separate circuit

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00565
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 18
Date Description Inspector Results Comments
05/12/2025 COT - RSPL - Rough Soil Passed Passed 5/12/25 ok to backfill
05/12/2025 COT - RSPL - Sewer Passed Passed 5/12/25 ok to backfill
05/12/2025 COT - RSPL - Yard Water Line Passed Passed 5/12/25 ok to backfill
05/20/2025 BULD - Electrical Clearance Passed 5-20-25, panel okay to be energized. ECO clearance sent to TEP.
05/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 5-20-25, preslab,excavation/reinforcement/setbacks verified per approved plans. Okay to pour concrete.
05/20/2025 COT - RSBU - Preslab Passed 5-20-25, preslab,excavation/reinforcement/setbacks verified per approved plans. Okay to pour concrete.
06/13/2025 COT - RSEL - Grounding/Bonding Passed 6-13-25: approved.
06/13/2025 COT - RSPL - Gas Pressure Test Passed 6-13-25: approved.
06/20/2025 COT - RSBU - Roof Nailing Passed
06/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/09/2025 COT - RSBU - Interior Shear Bracing Passed 7-9-25: okay for tape & texture.
08/08/2025 COT - BULD - SWG Clearance Passed 8.8.25
SWG clearance approved
09/11/2025 RSBU - Building Progress Passed
09/10/2025 COT - RSEL - Outdoor Lighting Passed 9.10.25
APPROVED
09/10/2025 COT - RSME - Mechanical Final Passed 9.10.25
APPROVED
09/10/2025 COT - RSPL - Plumbing Final Passed 9.10.25
APPROVED
09/15/2025 ENGR Engineering Final Passed Site is clear and accessible; complete in accordance with approved plans.