Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required | 5-27-25, add anchor bolts at marked locations, staple T-ply at upstairs south wall at base, add nails sill to decking at marked locations, make corrections to T-ply located at west wall, add shot pins to marked locations and nails to roof sheathing at southwest location. | |
| 06/04/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required | 6-4-25: correct blocking /sheathing along east side of garage by properly nailing to framing and install HTT5 at entry of southeast corner of garage. NOTE; Framing reinspect but home already lathed. | |
| 06/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required (with fee) | 6-13-25: add blocking behind t-ply at garage and staple 3" o.c.. throughout, add blocking above a/c whip on eastside of family room and reschedule when ready.Submit a letter to the city for review/approval documenting that exterior clips/sheathing was done per plans and meets the 2018 IRC. | |
| 06/16/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required | 6-16-25: add 1 "staples to t-ply at garage 3"o.c. at edges and in the field. | |
| 06/18/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required | 5-27-25, add anchor bolts at marked locations, staple T-ply at upstairs south wall at base, add nails sill to decking at marked locations, make corrections to T-ply located at west wall, add shot pins to marked locations and nails to roof sheathing at southwest location. 6-4-25: correct blocking /sheathing along east side of garage by properly nailing to framing and install HTT5 at entry of southeast corner of garage. NOTE; Framing reinspect but home already lathed. 6-13-25: add blocking behind t-ply at garage and staple 3" o.c.. throughout, add blocking above a/c whip on eastside of family room and reschedule when ready.Submit a letter to the city for review/approval documenting that exterior clips/sheathing was done per plans and meets the 2018 IRC. 6-16-25: add 1 "staples to t-ply at garage 3"o.c. at edges and in the field. 6/18/25: Shear wall fasteners not per plan and shall be no closer than 3/8" from edge. |
|
| 06/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed |