Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 6-13-25: firefoam chutes at garage, seal penetrations t-ply throughout, DWV not under test, tears on flex at kitchen area, block register on 3 sides at master bedroom, 12" clearance is required between pex and lights-block using osb, drywall, 2x4, plywood, block open space above a/c whip on east side of family room.. | |
| 06/16/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 6-16-25: shower not under test, firefoam garage chutes, staple awg within 12" of exiting coach light at garage chute, seal vapor barrier behind garage chute, add 1 "staples to t-ply at garage 3"o.c. at edges and in the field, block any pex within 12" of any lights using osb, plywood, 2x4's, or drywall. | |
| 06/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 6-13-25: firefoam chutes at garage, seal penetrations t-ply throughout, DWV not under test, tears on flex at kitchen area, block register on 3 sides at master bedroom, 12" clearance is required between pex and lights-block using osb, drywall, 2x4, plywood, block open space above a/c whip on east side of family room.. 6-16-25: shower not under test, firefoam garage chutes, staple awg within 12" of exiting coach light at garage chute, seal vapor barrier behind garage chute, add 1 "staples to t-ply at garage 3"o.c. at edges and in the field, block any pex within 12" of any lights using osb, plywood, 2x4's, or drywall. 6/18/25: staple romex within 12" of box, seal all penetrations through vapor barrier. Shear wall fasteners not per plan and shall be no closer than 3/8" from edge, nail plates at rough-ins with 1 1/4" of face of 2x. |
|
| 06/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |