Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
03/18/2024
Applicant:
Abraham Andraux
Description:
Carlos MP 1440 SFR

Permit Reviews

Permit Number - TC-MDP-0324-00311
Permit Status: Inspections complete
Permit Description: Carlos MP 1440 SFR
Start Date Submittal Complete Date Status  
03/19/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 04/04/2024 REQUIRES RESUBMIT Review Details
05/23/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 05/23/2024 REQUIRES RESUBMIT Review Details
09/19/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/30/2024 APPROVED Review Details
06/05/2024 RESTAMP - RESIDENTIAL v.1 06/05/2024 APPROVED Review Details
05/24/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 06/05/2024 APPROVED Review Details
09/13/2024 RESTAMP - RESIDENTIAL v.1 09/17/2024 APPROVED Review Details
05/06/2025 SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 05/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0324-00311
Permit Status: Inspections complete
Permit Description: Carlos MP 1440 SFR
Total Outstanding Activity Conditions - 3
Date Name
03/18/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/20/2025 A new site plan is required to be submitted to reflect the address change request showing the unit 1 that was added. In addition to your site plan, please provide a letter that states "Address change only"

Conditions

Permit Number - TC-MDP-0324-00311
Permit Status: Inspections complete
Permit Description: Carlos MP 1440 SFR
Date Description Comments
03/20/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
06/05/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/18/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00311
Permite Description: Carlos MP 1440 SFR
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/07/2024 COT - RSBU - Roof Nailing N/A Re-inspection required Several areas require additional nailing
10/04/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 10-4-24, missing lateral bracing-see truss calculations for details. Also, several areas on roof require additional nailing, add shot pins throughout interior framing, missing/loose anchor bolts. Exterior clip requires additional nailing-areas in question marked
10/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 10-15-24, intermediate not approved and Reinspection required. Electrical is not per approved plans (#of circuits do not match approved plans),customer added a pantry that is not on plans. Customer needs to revise plans or remove pantry altogether.
10/16/2024 COT - RSBU - Interior Shear Bracing N/A Partial Pass Several areas require additional nailing
10/7/24: shot pins required 24" o.c at interior walls, damaged sill plates must be replaced, shot pins required 6" from edge of sill plate, exterior sheathing must be properly fastened (fasteners shall be 3/8" from edge and not penetrate more than 1/8".
10/9/24: this is inspection is for drywall nailing.
10-15-24, listed items from 10-7-24 have been corrected.
07/21/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Canceled 7-21-25: canceled by contractor.
07/22/2025 COT - BULD - SWG Clearance N/A Not Applicable
07/21/2025 COT - RSBU - Preslab N/A Canceled 7-21-25: canceled by contractor.
07/21/2025 COT - RSEL - Grounding/Bonding N/A Canceled 7-21-25: canceled by contractor.
09/12/2025 ENGR Engineering Final N/A Not Ready Driveway is not paved. Accessible Route will need to extend to the right of way at street (mailbox area). One of the entrances is no step- good entryway and is on accessible route. Pavers set in concrete are acceptable.

Extend Accessible Route to the sidewalk.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00311
Permit Description: Carlos MP 1440 SFR
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/20/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 9/20/2024
10/07/2024 COT - RSBU - Roof Nailing Passed
10/09/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/15/2024 COT - RSPL - Sewer Passed 10-15-24, sewer connection verified and approved.
10/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/17/2024 approved. Corrections were made.
12/24/2024 COT - RSPL - Yard Water Line Passed 12/24/24 pass ok to backfill.
07/22/2025 COT - RSBU - Interior Shear Bracing Passed
07/22/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
07/22/2025 COT - RSBU - Preslab Passed
07/22/2025 COT - RSEL - Grounding/Bonding Passed
07/22/2025 RSBU - Building Progress Passed
07/25/2025 COT - RSEL - Electrical Underground Passed 7.25.25
Wires pulled in as requested. Ok to proceed.
07/30/2025 COT - RSPL - Backwater Valve Passed 7-30-25: backwater valve approved-Okay to backfill.
08/14/2025 BULD - Electrical Clearance Passed 8/14/25
TEP CLEARANCE: ECO
09/12/2025 COT - RSEL - Outdoor Lighting Passed Passed 9/12/25
09/12/2025 COT - RSEL - Electrical Final Passed Passed 9/12/25
09/12/2025 COT - RSME - Mechanical Final Passed Passed 9/12/25
09/12/2025 COT - RSPL - Gas Pressure Test Passed Passed 9/12/25
09/12/2025 COT - RSPL - Plumbing Final Passed Passed 9/12/25
09/12/2025 RSBU - Building Final Passed Passed 9/12/25
09/18/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-150_W_AVIATION_DF_V1.PDF DOCUMENTS VIEW
REVISION NARRATIVE__V1.PDF DOCUMENTS VIEW
1_CARLOS MODEL_MJCALCS_V3 (2)_V1.PDF DOCUMENTS VIEW
TC-MDP-0324-00311 (150 W AVIATION DR_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_CORRECTED_SITE_PLAN_V3.PDF DOCUMENTS VIEW