Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2025 | BULD - Electrical Clearance | Re-inspection required | 08 April 25 1. Missing meter sockets 2. Missing address labels 3. Missing ground/bonding |
|
| 04/15/2025 | BULD - Electrical Clearance | Re-inspection required | 4/15/2025 Not ready. Panels not installed per plan. | |
| 04/16/2025 | BULD - Electrical Clearance | Passed | 16 APRIL 25 TEP CLEARANCE:ECO 8/14/25 Pass |
|
| 08/14/2025 | BULD - Electrical Clearance | Passed | 8/14/25 TEP CLEARANCE: ECO |