Inspection Status: Passed

Inspection History: COT - RSBU - Interior Shear Bracing 

Date Description Inspector Results Comments
07/22/2025 COT - RSBU - Interior Shear Bracing  Passed
10/04/2024 COT - RSBU - Interior Shear Bracing  Not Ready
10/07/2024 COT - RSBU - Interior Shear Bracing  Re-inspection required Several areas require additional nailing
10/7/24: shot pins required 24" o.c at interior walls, damaged sill plates must be replaced, shot pins required 6" from edge of sill plate, exterior sheathing must be properly fastened (fasteners shall be 3/8" from edge and not penetrate more than 1/8".
10/09/2024 COT - RSBU - Interior Shear Bracing  Re-inspection required Several areas require additional nailing
10/7/24: shot pins required 24" o.c at interior walls, damaged sill plates must be replaced, shot pins required 6" from edge of sill plate, exterior sheathing must be properly fastened (fasteners shall be 3/8" from edge and not penetrate more than 1/8".
10/9/24: this is inspection is for drywall nailing.
10/15/2024 COT - RSBU - Interior Shear Bracing  Partial Pass Several areas require additional nailing
10/7/24: shot pins required 24" o.c at interior walls, damaged sill plates must be replaced, shot pins required 6" from edge of sill plate, exterior sheathing must be properly fastened (fasteners shall be 3/8" from edge and not penetrate more than 1/8".
10/9/24: this is inspection is for drywall nailing.
10-15-24, listed items from 10-7-24 have been corrected.