Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
02/26/2024
Applicant:
Paula Hinman
Description:
Blackhawk - T698 - Layla

Permit Reviews

Permit Number - TC-MDP-0124-00126
Permit Status: Inspections complete
Permit Description: Blackhawk - T698 - Layla
Start Date Submittal Complete Date Status  
03/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/22/2024 APPROVED Review Details
02/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/08/2024 APPROVED Review Details
08/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/14/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0124-00126
Permit Status: Inspections complete
Permit Description: Blackhawk - T698 - Layla
Date Description Comments
03/06/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/06/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/06/2024 Post-Tension Inspection Report is required.
09/25/2023 Post-Tension Inspection Report is required.
08/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/22/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/14/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/25/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00126
Permite Description: Blackhawk - T698 - Layla
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
06/21/2024 COT - RSEL - Grounding/Bonding N/A Re-inspection required 6/21/24:seal all penetrations through second floor decking, over notched bearing studs at garage require stud-shoe, seal penetration for tubs at second floor decking, gas pipe needs to be clamped to support, properly support condensation drains for furnace. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
06/21/2024 BULD - Electrical Clearance N/A Re-inspection required 6/21/24:seal all penetrations through second floor decking, over notched bearing studs at garage require stud-shoe, seal penetration for tubs at second floor decking, gas pipe needs to be clamped to support, properly support condensation drains for furnace. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
06/21/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 6/21/24:seal all penetrations through second floor decking, over notched bearing studs at garage require stud-shoe, seal penetration for tubs at second floor decking, gas pipe needs to be clamped to support, properly support condensation drains for furnace. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
08/29/2024 ENGR Engineering Final N/A Partial Pass Contractor needs to remove the trash bins in front of the house and the Porta potty

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00126
Permit Description: Blackhawk - T698 - Layla
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/12/2024 COT - RSPL - Rough Soil Passed
04/12/2024 COT - RSPL - Sewer Passed
04/12/2024 COT - RSPL - Yard Water Line Passed
04/25/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/25/2024 COT - RSBU - Preslab Passed
04/25/2024 COT - RSEL - Electrical Underground Passed
05/16/2024 COT - RSBU - Roof Nailing Passed
05/30/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/24/2024 COT - RSEL - Grounding/Bonding Passed
06/25/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 6/25/2024
06/25/2024 COT - RSPL - Gas Pressure Test Passed
06/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 6/26/2024
07/05/2024 COT - RSBU - Interior Shear Bracing Passed
07/31/2024 RSBU - Building Progress Passed
08/21/2024 COT - RSEL - Outdoor Lighting Passed
08/21/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/21/2024
09/03/2024 COT - RSEL - Electrical Final Passed All corrections were made. 9/3/2024
09/03/2024 COT - RSME - Mechanical Final Passed All corrections were made. 9/3/2024
09/03/2024 ENGR Engineering Final Passed Move in ready
09/03/2024 COT - RSPL - Plumbing Final Passed
09/09/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
147185 PT LOT 62 COMPLETE-2024-08-09_V1.PDF DOCUMENTS VIEW
REV1_1_PLAN SET LOT 62 PLOT PLAN_03.11.24_V1.PDF DOCUMENTS VIEW
REV1_1_REVISION NARRATIVE TC-MDP-0124-00126 LOT 62 _03.11.24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLACKHAWK RANCH LOT 62 PLOT PLAN_6038 E CAMPLOINA TR_START_V1.PDF DOCUMENTS VIEW
BLACKHAWK- T698_SIC_LOT 62 6038 E CAMPLOINA TR-2024-02-26_V1.PDF DOCUMENTS VIEW