Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 06/21/2024 |
BULD - Electrical Clearance |
|
Re-inspection required |
6/21/24:seal all penetrations through second floor decking, over notched bearing studs at garage require stud-shoe, seal penetration for tubs at second floor decking, gas pipe needs to be clamped to support, properly support condensation drains for furnace. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 06/24/2024 |
BULD - Electrical Clearance |
|
Re-inspection required |
Partial pass. Pending DWV on test throughout 2nd floor. Nosing at stairs exceeding measurement. 6/24/2024 |
| 06/25/2024 |
BULD - Electrical Clearance |
|
Passed |
Clearance for TEP ECO. 6/25/2024 |