Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 06/21/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
6/21/24:seal all penetrations through second floor decking, over notched bearing studs at garage require stud-shoe, seal penetration for tubs at second floor decking, gas pipe needs to be clamped to support, properly support condensation drains for furnace. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 06/24/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Partial pass. Pending DWV on test throughout 2nd floor. Nosing at stairs exceeding measurement. 6/24/2024 |
| 06/25/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Per DWV 2nd floor. 6/25/2024 |
| 06/26/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
Corrections were made. 6/26/2024 |