Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical Final
Permit Number - TC-MDP-0124-00126
Inspection Description - COT - RSME - Mechanical Final
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/22/2024 | COT - RSME - Mechanical Final | Re-inspection required | 8/22/24: 6" clearance required from grade at pressure relief discharge, all exterior piping must be UV coated, stucco repair, properly install collars at vents, seal all penetrations through stucco, ac refrigeration lines must be uv coated, caps at A/c condenser required, post tension tag required at hose bib, clean out must be cut to grade. Engineering final must be passed. Not ready, Stopped inspection more items may be added | |
08/29/2024 | COT - RSME - Mechanical Final | Canceled | Canceled per contractor. 8/29/2024 | |
09/03/2024 | COT - RSME - Mechanical Final | Passed | All corrections were made. 9/3/2024 |