Permit: TC-COM-1222-00254
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2943 N CAMPBELL AV
Address NEW:
2943 N CAMPBELL AV
Apply Date:
12/08/2022
Applicant:
John McColgin
Description:
Existing Pizza Hut conversion into a "First Watch, the daytime cafe" New 788 sq.ft. covered exterior dining patio addition new sprinkler system Interior renovation with new finishes, all new kitchen equipment
Permit Reviews
Permit Number - TC-COM-1222-00254
Permit Status: Complete
Permit Description: Existing Pizza Hut conversion into a "First Watch, the daytime cafe"
New 788 sq.ft. covered exterior dining patio addition
new sprinkler system
Interior renovation with new finishes, all new kitchen equipment
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/02/2024 | REQUIRES RESUBMIT |
| 12/28/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/28/2022 | REQUIRES RESUBMIT |
| 10/26/2023 | COMMERCIAL REVIEW - FULL v.1 | 11/29/2023 | APPROVED |
| 08/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/19/2024 | REQUIRES RESUBMIT |
| 12/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 12/20/2024 | APPROVED |
| 07/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | REQUIRES RESUBMIT |
| 05/17/2023 | RESTAMP - COMMERCIAL v.1 | 05/18/2023 | APPROVED |
| 01/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/25/2024 | APPROVED |
| 11/29/2023 | RESTAMP - COMMERCIAL v.1 | 11/30/2023 | APPROVED |
| 07/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 07/30/2024 | APPROVED |
| 05/17/2023 | COMMERCIAL REVIEW - FULL v.3 | 05/17/2023 | APPROVED |
| 07/25/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/04/2023 | APPROVED |
| 10/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 10/31/2024 | REQUIRES RESUBMIT |
| 01/04/2023 | COMMERCIAL REVIEW - FULL v.2 | 05/16/2023 | REQUIRES RESUBMIT |
| 03/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/18/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1222-00254
Permit Status: Complete
Permit Description: Existing Pizza Hut conversion into a "First Watch, the daytime cafe"
New 788 sq.ft. covered exterior dining patio addition
new sprinkler system
Interior renovation with new finishes, all new kitchen equipment
| Date | Description | Comments |
|---|---|---|
| 05/17/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 05/16/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 03/12/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/12/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 05/17/2023 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
| 03/12/2024 | Masonry Inspection Report submittal review is required. | |
| 03/12/2024 | Factory Fabricated Patio Cover Designs must be submitted and approved prior to final. | |
| 03/12/2024 | Kitchen Hood Suppression Designs must be submitted and approved prior to final. | |
| 03/12/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 03/12/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 05/17/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1222-00254
Permite Description: Existing Pizza Hut conversion into a "First Watch, the daytime cafe"
New 788 sq.ft. covered exterior dining patio addition
new sprinkler system
Interior renovation with new finishes, all new kitchen equipment
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2023 | COT - HCEL - Electrical Intermediate | N/A | Not Ready | 8/3/23: Roof not dried in, not ready for intermediates,insulation, or wallboard. 8/9/23 In wall ok to cover, 10/12/23 - NR for clearance, missing grounding, bonding, no buss bars or primary conductors present for 3phase connections 10/26/23: NR for Clearance, missing second ground rod, no primary conductors missing present for 3phase connections, missing 2 200 amp breakers and revision needs to be sent in for change in 800amp to 600amp main breaker. |
| 07/14/2023 | COT - HCBU - Framing | N/A | Re-inspection required | 7/14/23: fur-out wall needs to be attached to masonry throughout, missing nails to fur-out, kitchen area can one side only. |
| 07/17/2023 | COT - HCBU - Preslab | N/A | Partial Pass | 7/14/23: footers need to be the appropriate depth 7/17/23: footers at appropriate depth |
| 12/04/2023 | ENGR Engineering Final | N/A | Not Ready | active construction site |
| 01/26/2024 | COT - FCON - Sprinkler - Final | N/A | Partial Pass | Waiting on Knox caps. |
| 01/26/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Waiting on Knox box and FDC caps, Class K extinguisher, fire extinguishers, places of assembly permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1222-00254
Permit Description: Existing Pizza Hut conversion into a "First Watch, the daytime cafe"
New 788 sq.ft. covered exterior dining patio addition
new sprinkler system
Interior renovation with new finishes, all new kitchen equipment
Total Completed Inspections - 31
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2023 | COT - HCPL - Rough Soil | Passed | 5/30/23: all new soil lines inside the existing structure approved to shade and cover. | |
| 05/30/2023 | COT - HCPL - Backwater Valve | Passed | 5/30/23: backwater valve inspected and approved to cover. | |
| 06/09/2023 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 07/14/2023 | COT - HCBU - Masonry Pregrout | Passed | ||
| 09/21/2023 | COT - HCBU - Building Above Ceiling | Passed | ||
| 11/17/2023 | BULD - Electrical Clearance | Passed | INCR to TEP 11/21/23 clearance resent |
|
| 12/01/2023 | COT - HCPL - Gas Pressure Test | Passed | ||
| 12/01/2023 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 12/1/2023 | |
| 01/23/2024 | COT - FCON - Alarm - Final | Passed | ||
| 01/23/2024 | COT - FCON - Hood System - Final | Passed | ||
| 01/26/2024 | COT - HCPL - Gas Final | Passed | ||
| 01/26/2024 | COT - HCEL - Electrical Intermediate | Passed | This inspection is approved per contractor responsibility letter. | |
| 01/26/2024 | COT - HCBU - Framing | Passed | This inspection is approved per contractor responsibility letter. | |
| 01/26/2024 | COT - HCEL - Electrical Underground | Passed | This inspection is approved per contractor responsibility letter. See files. | |
| 01/26/2024 | COT - HCBU - Preslab | Passed | This inspection is approved per contractor responsibility letter. See files. | |
| 01/26/2024 | COT - HCPL - Plumbing Intermediate | Passed | This inspection is approved per contractor responsibility letter. | |
| 01/26/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/26/2024 | COT - HCBU - Roof Nailing | Passed | This inspection is approved per contractor responsibility letter. See files. | |
| 01/26/2024 | COT - HCEL - Electrical Above Ceiling | Passed | This inspection is approved per contractor responsibility letter. See files. | |
| 01/26/2024 | COT - HCEL - Electrical Final | Passed | ||
| 01/26/2024 | COT - HCEL - Grounding/Bonding | Passed | This inspection is approved per contractor responsibility letter. See files. | |
| 01/26/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
| 01/26/2024 | COT - HCME - Mechanical Final | Passed | ||
| 01/26/2024 | COT - HCME - Mechanical Above Ceiling | Passed | This inspection is approved per contractor responsibility letter. See files. | |
| 01/26/2024 | COT - HCME - Mechanical Intermediate | Passed | This inspection is approved per contractor responsibility letter. See files. | |
| 01/26/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | This inspection is approved per contractor responsibility letter. See files. | |
| 01/26/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 02/22/2024 | ENGR Engineering Final | Passed | current solid waste enclosure not per COT standards, should Environmental Services require changes to enclosure, a Development Package permit will be required, per David Roberts with COT PDS. | |
| 03/01/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 03/01/2024 | COT - FCON - Fire - Final | Passed | ||
| 03/07/2024 | COT - HCBU - Building Final | Passed |