Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/26/2024 |
ENGR Engineering Final
|
|
Not Ready |
there is no history of inspections for development package. Permit contractor is installing sidewalk scuppers at this time all the way around the building. Trash enclosure was not inspected and does not meet the specifications of detail 8.01. There is only 8‘ 8 inches clear between bollards. |
| 02/15/2024 |
ENGR Engineering Final
|
|
Not Ready |
contractor not ready at this time. Will reinspect this insight on 2/16/2024. |
| 02/22/2024 |
ENGR Engineering Final
|
|
Passed |
current solid waste enclosure not per COT standards, should Environmental Services require changes to enclosure, a Development Package permit will be required, per David Roberts with COT PDS. |
| 12/04/2023 |
ENGR Engineering Final
|
|
Not Ready |
active construction site |