Permit: TC-COM-1124-02231
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
3520 S KINO PW
Address NEW:
3520 S KINO PW
Apply Date:
11/19/2024
Applicant:
David Openshaw
Description:
New construction of a 5,196 sf commercial restaurant with a double-wide drive-thru, 2 Canopies covering drive-thru meal delivery and order point, and a separate trash enclosure
Permit Reviews
Permit Number - TC-COM-1124-02231
Permit Status: Needs resubmittal
Permit Description: New construction of a 5,196 sf commercial restaurant with a double-wide drive-thru, 2 Canopies covering drive-thru meal delivery and order point, and a separate trash enclosure
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/22/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/17/2024 | REQUIRES RESUBMIT |
| 05/23/2025 | RESTAMP - COMMERCIAL v.1 | 05/29/2025 | APPROVED |
| 01/31/2025 | COMMERCIAL REVIEW - FULL v.2 | 02/18/2025 | REQUIRES RESUBMIT |
| 08/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/06/2025 | APPROVED |
| 04/16/2025 | RESTAMP - COMMERCIAL v.1 | 04/23/2025 | APPROVED |
| 01/15/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/20/2026 | REQUIRES RESUBMIT |
| 03/26/2025 | COMMERCIAL REVIEW - FULL v.3 | 04/16/2025 | APPROVED |
| 01/22/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/26/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-1124-02231
Permit Status: Needs resubmittal
Permit Description: New construction of a 5,196 sf commercial restaurant with a double-wide drive-thru, 2 Canopies covering drive-thru meal delivery and order point, and a separate trash enclosure
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/15/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 01/15/2026 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
Conditions
Permit Number - TC-COM-1124-02231
Permit Status: Needs resubmittal
Permit Description: New construction of a 5,196 sf commercial restaurant with a double-wide drive-thru, 2 Canopies covering drive-thru meal delivery and order point, and a separate trash enclosure
| Date | Description | Comments |
|---|---|---|
| 11/22/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 11/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/15/2026 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 04/30/2025 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 11/22/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/22/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 12/16/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-1124-02231
Permite Description: New construction of a 5,196 sf commercial restaurant with a double-wide drive-thru, 2 Canopies covering drive-thru meal delivery and order point, and a separate trash enclosure
Total Outstanding Inspections - 13
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2025 | COT - HCBU - TCO | N/A | Not Ready | |
| 08/13/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Canopy column footings as per RFI #17 at GL: 1/A - E.5; 6 footings. Ok to place concrete in progress areas. |
| 11/13/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | 11-13-25: okay to install ceiling tiles at dining and restroom vestibule areas. |
| 11/07/2025 | COT - LCME - Mechanical Final | N/A | Partial Pass | Hood duct system wrapped. |
| 07/30/2025 | COT - HCPL - Rough Soil | N/A | Partial Pass | 7-30-25: grease interceptor verified per plans & under test-okay to backfill progress areas. |
| 10/15/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 10-15-25: main water line stemmed into utility room room verified under test at 60 psi. Okay to backfill progress areas. |
| 09/15/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | Kitchen area: fryer area and walk-in cooler areas. Ok to,cover progress areas. |
| 01/09/2026 | COT - HCPL - Plumbing Final | N/A | Re-inspection required | Inspector Findings – 01/09/2026 Exterior receptacles do not have required approved weatherproof covers. Junction box covers are missing at the fire riser. Air gap is required at the fire riser. ADA receptacle requirements are not met. Circuit B-82 has no power. Water heater manufacturer’s required side clearance is not met. All disconnect boxes are not labeled. Roof receptacle has no power. All rooftop equipment must be labeled, and proper amperage must be verified for all equipment. Insulation at the ice maker is not properly protected. Kitchen equipment is not properly secured to the wall. Circuit B-27 is off at the seating area. NOTE: on the panels that were penetrated via screws, one of the following options is required.1) a UL inspection by the manufacturer is required and the inspection report would have to submitted to the for city for review 2) a letter by the UL manufacturer documenting the panels are safe to use and there is no possibility of arching 3) replace panels. Conditions for Occupancy: Engineering final inspection must be approved prior to issuance of Certificate of Occupancy (CofO). Water sterilization is required prior to issuance of Temporary Certificate of Occupancy (TCO) above Level 1. Pima County Health Department inspection must be approved prior to issuance of TCO above Level 2. |
| 10/15/2025 | COT - HCPL - Gas Pressure Test | N/A | Partial Pass | 10-15-25: verified gas pressure test at 15psi on approximately 120' of exterior piping from the southeast quad of site which runs west to a future canopy. Note: interior gas lines have not been installed and are required to be tested. |
| 09/02/2025 | COT - HCEL - Outdoor Lighting | N/A | Partial Pass | 9-2-25: reinforcement on 13 light pole cages verified per plans. Okay for concrete placement at progress areas. |
| 01/09/2026 | COT - HCEL - Electrical Final | N/A | Re-inspection required | Inspector Findings – 01/09/2026 Exterior receptacles do not have required approved weatherproof covers. Junction box covers are missing at the fire riser. Air gap is required at the fire riser. ADA receptacle requirements are not met. Circuit B-82 has no power. Water heater manufacturer’s required side clearance is not met. All disconnect boxes are not labeled. Roof receptacle has no power. All rooftop equipment must be labeled, and proper amperage must be verified for all equipment. Insulation at the ice maker is not properly protected. Kitchen equipment is not properly secured to the wall. Circuit B-27 is off at the seating area. NOTE: on the panels that were penetrated via screws, one of the following options is required.1) a UL inspection by the manufacturer is required and the inspection report would have to submitted to the for city for review 2) a letter by the UL manufacturer documenting the panels are safe to use and there is no possibility of arching 3) replace panels. Conditions for Occupancy: Engineering final inspection must be approved prior to issuance of Certificate of Occupancy (CofO). Water sterilization is required prior to issuance of Temporary Certificate of Occupancy (TCO) above Level 1. Pima County Health Department inspection must be approved prior to issuance of TCO above Level 2. |
| 09/09/2025 | COT - LCBU - Building Final | N/A | Partial Pass | 9-9-25: extended pararpet on high walls (north, south, east & west side) verified per detail S601/A3. Okay to install 5/8" wood deck at progress areas-call for a nailing inspection when ready. |
| 01/23/2026 | ENGR Engineering Final | N/A | Partial Pass | Okay for TCO level 4. Contractor will finish all work on site as discussed before store opening, If needed any more work will take place on Sundays when store is closed. Public access or safety will not be impeded by unfinished work. -Asphalt repair at south end of parking lot at the scupper into the drive through area to address puddling. Sealing all asphalt patches and restriping these patches and where necessary, tree root barriers and painting sidewalk scuppers. |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-1124-02231
Permit Description: New construction of a 5,196 sf commercial restaurant with a double-wide drive-thru, 2 Canopies covering drive-thru meal delivery and order point, and a separate trash enclosure
Total Completed Inspections - 28