Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCPL - Gas Pressure Test
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | COT - HCPL - Gas Pressure Test | Passed | ||
| 10/15/2025 | COT - HCPL - Gas Pressure Test | Partial Pass | 10-15-25: verified gas pressure test at 15psi on approximately 120' of exterior piping from the southeast quad of site which runs west to a future canopy. Note: interior gas lines have not been installed and are required to be tested. |