Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
Permit Number - TC-COM-1124-02231
Inspection Description - ENGR Engineering Final
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2026 | ENGR Engineering Final | Partial Pass | OK for level 2 TCO. Staff Training is OK/no public. temporary fencing or snow fencing will need to separate parking training staff from construction areas. Safety must be maintained. Construction materials and heavy equipment must be separated by temp fencing from staff. Spotters must be used if any equipment needs to be used in areas for staff parking or public area. |
|
| 01/23/2026 | ENGR Engineering Final | Partial Pass | Okay for TCO level 4. Contractor will finish all work on site as discussed before store opening, If needed any more work will take place on Sundays when store is closed. Public access or safety will not be impeded by unfinished work. -Asphalt repair at south end of parking lot at the scupper into the drive through area to address puddling. Sealing all asphalt patches and restriping these patches and where necessary, tree root barriers and painting sidewalk scuppers. |