Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 13213120G


Addresses:

3520 S KINO PW


Inspection Status: Partial Pass

Inspection History: COT - LCBU - Building Final 

Permit Number - TC-COM-1124-02231

Inspection Description - COT - LCBU - Building Final 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
07/14/2025 COT - LCBU - Building Final  Partial Pass This inspection is for wall footings and interior column footings. Requested PDSD add an excavation/rebar inspection to this permit.
08/07/2025 COT - LCBU - Building Final  Partial Pass 8-7-25: reinforcement verified per foundation plan-Okay for concrete placement.
08/11/2025 COT - LCBU - Building Final  Partial Pass Partial pass. Total of 6 spread footers for canopy. Detail F11 page F2FC2. Okay for concrete placement. 8/11/2025
08/29/2025 COT - LCBU - Building Final  Re-inspection required 8-29-25: framing inspection-missing anchor bolts, bolts & washers throughout together with hold downs. Missing A-34's per detail S301/D3, sheathing nailing not per schedule-nailing cannot be closure than 3/8" from edges/joints and cannot over-penetrate more /16".
Note: stopped inspection-additional items may be added. Reschedule inspection when ready.
09/05/2025 COT - LCBU - Building Final  Partial Pass 9-5-25: hold-downs/anchor bolts, nailing at exterior clips/sheathing at shear walls verified per plans. Roof & parapet nailing also inspected & approved-Okay to dry-in roof/parapets and install double exterior walls.
09/09/2025 COT - LCBU - Building Final  Partial Pass 9-9-25: extended pararpet on high walls (north, south, east & west side) verified per detail S601/A3. Okay to install 5/8" wood deck at progress areas-call for a nailing inspection when ready.
09/17/2025 COT - LCBU - Building Final  Partial Pass This inspection is for densglas nailing for cooking hood area and walk - in cooler areas.
10/03/2025 COT - LCBU - Building Final  Partial Pass 10-3-25: in wall DWV/domestic verified under test at back house areas. In wall electrical at same areas verified per plans, however, add Boca plates where blocking was over notched & firefoam all penetrations. Areas of focus include, back interior south wall & several areas throughout back house located on east & central walls. Inspection required for mentioned areas.
10/09/2025 COT - LCBU - Building Final  Re-inspection required 10/9/25: re-inspection required for shearwall.
10/10/2025 COT - LCBU - Building Final  Partial Pass 10-10-25: shear wall nailing at dining, queue, meal fulfillment area, ready vest, storage, it closet, office, kitchen, service area, eq room verified per plans and approved. Okay to continue with construction at progress areas.
NOTE: on the panels that were penetrated via screws, one of the following options is required.1) a UL inspection by the manufacturer is required and the inspection report would have to submitted to the for city for review 2) a letter by the UL manufacturer documenting the panels are safe to use and there is no possibility of arching 3) replace panels.
10/30/2025 COT - LCBU - Building Final  Canceled Contractor canceled: information only.