Parcel: 13213120G


Addresses:

3520 S KINO PW


Inspection Status: Requested

Inspection History: COT - LCBU - Building Final 

Permit Number - TC-COM-1124-02231

Inspection Description - COT - LCBU - Building Final 

Inspection Status - Requested

Date Description Inspector Results Comments
COT - LCBU - Building Final  Requested
01/09/2026 COT - LCBU - Building Final  Re-inspection required Inspector Findings – 01/09/2026
Exterior receptacles do not have required approved weatherproof covers.
Junction box covers are missing at the fire riser.
Air gap is required at the fire riser.
ADA receptacle requirements are not met.
Circuit B-82 has no power.
Water heater manufacturer’s required side clearance is not met.
All disconnect boxes are not labeled.
Roof receptacle has no power.
All rooftop equipment must be labeled, and proper amperage must be verified for all equipment.
Insulation at the ice maker is not properly protected.
Kitchen equipment is not properly secured to the wall.
Circuit B-27 is off at the seating area.
NOTE: on the panels that were penetrated via screws, one of the following options is required.1) a UL inspection by the manufacturer is required and the inspection report would have to submitted to the for city for review 2) a letter by the UL manufacturer documenting the panels are safe to use and there is no possibility of arching 3) replace panels.
Conditions for Occupancy:
Engineering final inspection must be approved prior to issuance of Certificate of Occupancy (CofO).
Water sterilization is required prior to issuance of Temporary Certificate of Occupancy (TCO) above Level 1.
Pima County Health Department inspection must be approved prior to issuance of TCO above Level 2.
07/14/2025 COT - LCBU - Building Final  Partial Pass This inspection is for wall footings and interior column footings. Requested PDSD add an excavation/rebar inspection to this permit.
08/07/2025 COT - LCBU - Building Final  Partial Pass 8-7-25: reinforcement verified per foundation plan-Okay for concrete placement.
08/11/2025 COT - LCBU - Building Final  Partial Pass Partial pass. Total of 6 spread footers for canopy. Detail F11 page F2FC2. Okay for concrete placement. 8/11/2025
08/29/2025 COT - LCBU - Building Final  Re-inspection required 8-29-25: framing inspection-missing anchor bolts, bolts & washers throughout together with hold downs. Missing A-34's per detail S301/D3, sheathing nailing not per schedule-nailing cannot be closure than 3/8" from edges/joints and cannot over-penetrate more /16".
Note: stopped inspection-additional items may be added. Reschedule inspection when ready.
09/05/2025 COT - LCBU - Building Final  Partial Pass 9-5-25: hold-downs/anchor bolts, nailing at exterior clips/sheathing at shear walls verified per plans. Roof & parapet nailing also inspected & approved-Okay to dry-in roof/parapets and install double exterior walls.
09/09/2025 COT - LCBU - Building Final  Partial Pass 9-9-25: extended pararpet on high walls (north, south, east & west side) verified per detail S601/A3. Okay to install 5/8" wood deck at progress areas-call for a nailing inspection when ready.
09/17/2025 COT - LCBU - Building Final  Partial Pass This inspection is for densglas nailing for cooking hood area and walk - in cooler areas.
10/03/2025 COT - LCBU - Building Final  Partial Pass 10-3-25: in wall DWV/domestic verified under test at back house areas. In wall electrical at same areas verified per plans, however, add Boca plates where blocking was over notched & firefoam all penetrations. Areas of focus include, back interior south wall & several areas throughout back house located on east & central walls. Inspection required for mentioned areas.
10/09/2025 COT - LCBU - Building Final  Re-inspection required 10/9/25: re-inspection required for shearwall.
10/10/2025 COT - LCBU - Building Final  Partial Pass 10-10-25: shear wall nailing at dining, queue, meal fulfillment area, ready vest, storage, it closet, office, kitchen, service area, eq room verified per plans and approved. Okay to continue with construction at progress areas.
NOTE: on the panels that were penetrated via screws, one of the following options is required.1) a UL inspection by the manufacturer is required and the inspection report would have to submitted to the for city for review 2) a letter by the UL manufacturer documenting the panels are safe to use and there is no possibility of arching 3) replace panels.
10/30/2025 COT - LCBU - Building Final  Canceled Contractor canceled: information only.
12/29/2025 COT - LCBU - Building Final  Not Ready