Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-1124-02135
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
2150 E BROADWAY BL
Address NEW:
2150 E BROADWAY BL
Apply Date:
11/06/2024
Applicant:
JR Durazo
Description:
New Retail Shell Bldg
Permit Reviews
Permit Number - TC-COM-1124-02135
Permit Status: Inspections
Permit Description: New Retail Shell Bldg
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2025 | RESTAMP - COMMERCIAL v.1 | 04/01/2025 | APPROVED |
| 05/15/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/16/2025 | APPROVED |
| 05/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/09/2025 | APPROVED |
| 01/15/2025 | COMMERCIAL REVIEW - FULL v.2 | 02/05/2025 | REQUIRES RESUBMIT |
| 11/07/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/09/2024 | REQUIRES RESUBMIT |
| 03/20/2025 | COMMERCIAL REVIEW - FULL v.3 | 03/27/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1124-02135
Permit Status: Inspections
Permit Description: New Retail Shell Bldg
| Date | Description | Comments |
|---|---|---|
| 11/07/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/07/2024 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
| 11/07/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/07/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1124-02135
Permite Description: New Retail Shell Bldg
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 9/2/25: reinforcement per approved plans at SW loading dock footers. Ok to proceed with concrete placement. |
| 10/21/2025 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 1st Lift of veneer. |
| 08/12/2025 | COT - HCPL - Sewer | N/A | Not Ready | |
| 06/26/2025 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | 6-26-25: reinforcement on perimeter footing (F1) verified per plans. Okay to pour at progress areas. |
| 01/28/2026 | COT - HCBU - Roof Nailing | N/A | Not Applicable | |
| 08/07/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | Six light pole bases n North and East sides. |
| 08/07/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | Six light pole bases n North and East sides. |
| 11/25/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Plumbing above ceiling: domestic water lines at 1” and 1 1/2”; hose bibs from,building and at trash enclosure. |
| 03/02/2026 | COT - HCEL - Electrical Final | N/A | Not Ready | |
| 03/02/2026 | ENGR Engineering Final | N/A | Partial Pass | contractor needs to install the address to the building on the Broadway side. Needs to install handicap, parking sign, and striping and handicap striping. Contractor needs to install the gate for the trash enclosure. And to remove all construction material on site and remove the fencing. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1124-02135
Permit Description: New Retail Shell Bldg
Total Completed Inspections - 28
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 10/23/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | balance of light poles and 60’ of UG Electric North of East pole. | |
| 10/29/2025 | COT - HCBU - Framing | Passed | ||
| 11/03/2025 | COT - HCPL - Yard Water Line | Passed | Ok to cover progress areas. | |
| 11/06/2025 | COT - HCPL - Rough Soil | Passed | Interior waste lines at 3” - 4”. Ok to cover progress areas. | |
| 11/17/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 11/17/2025 | COT - HCPL - Plumbing Roof Drains | Passed | ||
| 11/21/2025 | BULD - Electrical Clearance | Passed | 11/21/25: TEP ECO Clearance for 2150 E Broadway BL and 2150 E Broadway BL House Panel | |
| 11/25/2025 | COT - HCBU - Masonry Pregrout | Passed | Southwest portion,of building; decorative block topped out at 19’ 4”. Ok to place grout in progress areas. | |
| 12/12/2025 | COT - HCBU - Stem Wall/Retaining Wall | Passed | 12/12/25 Loading dock east wall. |
|
| 12/17/2025 | COT - HCBU - Building Progress | Passed | Loading dock. | |
| 01/28/2026 | COT - HCPL - Sewer | Passed | Connection made, checked at plumbing underground | |
| 01/28/2026 | COT - BULD - SWG Clearance | Passed | Passed run up to building, meter will be set after interior work is completed | |
| 01/28/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/28/2026 | COT - HCEL - Grounding/Bonding | Passed | Passed at earlier date, verified bonding | |
| 01/28/2026 | COT - HCEL - Outdoor Lighting | Passed | Passed 1/28/26 | |
| 02/06/2026 | COT - HCBU - Building Final | Passed | Shell building portion of project. | |
| 02/06/2026 | COT - FCON - Alarm - Final | Passed | Approved on 12/30/25 on permit TF-FCP-1025-00918 | |
| 02/06/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 02/06/2026 | COT - HCEL - Electrical Progress | Passed | ||
| 02/06/2026 | COT - HCEL - Electrical Underground | Passed | ||
| 02/06/2026 | COT - HCME - Mechanical Final | Passed | ||
| 02/06/2026 | COT - HCPL - Gas Pressure Test | Passed | ||
| 02/06/2026 | COT - HCPL - Gas Final | Passed | ||
| 03/02/2026 | COT - HCPL - Plumbing Progress | Passed | ||
| 03/02/2026 | COT - HCPL - Plumbing Final | Passed | ||
| 03/02/2026 | COT - HCME - Mechanical Progress | Passed | ||
| 03/02/2026 | COT - FCON - Fire - Final | Passed |