Permit Details

Status:
Inspections
Type:
Commercial Building
Address NEW:
2150 E BROADWAY BL
Apply Date:
11/06/2024
Applicant:
JR Durazo
Description:
New Retail Shell Bldg

Permit Reviews

Permit Number - TC-COM-1124-02135
Permit Status: Inspections
Permit Description: New Retail Shell Bldg
Start Date Submittal Complete Date Status  
03/27/2025 RESTAMP - COMMERCIAL v.1 04/01/2025 APPROVED Review Details
05/15/2025 COMMERCIAL REVIEW - FULL REVISION v.1 06/16/2025 APPROVED Review Details
05/09/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/09/2025 APPROVED Review Details
01/15/2025 COMMERCIAL REVIEW - FULL v.2 02/05/2025 REQUIRES RESUBMIT Review Details
11/07/2024 COMMERCIAL REVIEW - FULL v.1 12/09/2024 REQUIRES RESUBMIT Review Details
03/20/2025 COMMERCIAL REVIEW - FULL v.3 03/27/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1124-02135
Permit Status: Inspections
Permit Description: New Retail Shell Bldg
Date Description Comments
11/07/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/07/2024 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
11/07/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/07/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1124-02135
Permite Description: New Retail Shell Bldg
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
08/07/2025 COT - HCEL - Electrical Progress N/A Partial Pass Six light pole bases n North and East sides.
06/26/2025 COT - HCEL - Grounding/Bonding N/A Partial Pass 6-26-25: reinforcement on perimeter footing (F1) verified per plans. Okay to pour at progress areas.
08/12/2025 COT - HCPL - Sewer N/A Not Ready
10/15/2025 COT - HCBU - Stem Wall/Retaining Wall N/A Partial Pass 10/15/25
Partial pass, pending lift on the SW corner about 15 ft. Dock level wall.
09/02/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 9/2/25: reinforcement per approved plans at SW loading dock footers. Ok to proceed with concrete placement.
08/07/2025 COT - HCEL - Electrical Underground N/A Partial Pass Six light pole bases n North and East sides.
11/17/2025 COT - HCBU - Building Progress N/A Not Ready Call in at finals. 11/17/2025
10/21/2025 COT - HCBU - Masonry Pregrout N/A Partial Pass 1st Lift of veneer.
11/25/2025 COT - HCPL - Plumbing Progress N/A Partial Pass Plumbing above ceiling: domestic water lines at 1” and 1 1/2”; hose bibs from,building and at trash enclosure.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-1124-02135
Permit Description: New Retail Shell Bldg
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/21/2025 COT - HCBU - Exterior Clips/Sheathing Passed
10/23/2025 COT - HCBU - Excavation/Rebar/Zoning Passed balance of light poles and 60’ of UG Electric North of East pole.
10/29/2025 COT - HCBU - Framing Passed
11/03/2025 COT - HCPL - Yard Water Line Passed Ok to cover progress areas.
11/06/2025 COT - HCPL - Rough Soil Passed Interior waste lines at 3” - 4”. Ok to cover progress areas.
11/17/2025 COT - HCEL - Electrical Intermediate Passed
11/17/2025 COT - HCPL - Plumbing Roof Drains Passed
11/21/2025 BULD - Electrical Clearance Passed 11/21/25: TEP ECO Clearance for 2150 E Broadway BL and 2150 E Broadway BL House Panel
11/25/2025 COT - HCBU - Masonry Pregrout Passed Southwest portion,of building; decorative block topped out at 19’ 4”. Ok to place grout in progress areas.

Documents

File Name Document Type  
25-05-08 ZONA REVISION LETTER_V1.PDF DOCUMENTS VIEW
TRADER JOE'S BROADWAY E1.0-ELECTRICAL SITE PLAN E3.0-ELECTRICAL ONE-LINE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_CONSTRUCTION DUCUMENT SET_V1.PDF DOCUMENTS VIEW
2150 E. BROADWAY TRADER JOES SHELL - ENVELOPE COMPLIANCE CERTIFICATE(96)(81)_V1.PDF DOCUMENTS VIEW
3_GEOTECH EVAL_V1.PDF DOCUMENTS VIEW
3_STRUC CALCS_V1.PDF DOCUMENTS VIEW
3_TRADER JOE'S, SPECIAL_INSPECTION_CERTIFICATE, COT, 1ST STAMP(19)_V1.PDF DOCUMENTS VIEW