Permit: TC-COM-1124-02135
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
2150 E BROADWAY BL
Address NEW:
2150 E BROADWAY BL
Apply Date:
11/06/2024
Applicant:
JR Durazo
Description:
New Retail Shell Bldg
Permit Reviews
Permit Number - TC-COM-1124-02135
Permit Status: Inspections
Permit Description: New Retail Shell Bldg
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2025 | RESTAMP - COMMERCIAL v.1 | 04/01/2025 | APPROVED |
| 05/15/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/16/2025 | APPROVED |
| 05/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/09/2025 | APPROVED |
| 01/15/2025 | COMMERCIAL REVIEW - FULL v.2 | 02/05/2025 | REQUIRES RESUBMIT |
| 11/07/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/09/2024 | REQUIRES RESUBMIT |
| 03/20/2025 | COMMERCIAL REVIEW - FULL v.3 | 03/27/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1124-02135
Permit Status: Inspections
Permit Description: New Retail Shell Bldg
| Date | Description | Comments |
|---|---|---|
| 11/07/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/07/2024 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
| 11/07/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/07/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-1124-02135
Permite Description: New Retail Shell Bldg
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | Six light pole bases n North and East sides. |
| 06/26/2025 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | 6-26-25: reinforcement on perimeter footing (F1) verified per plans. Okay to pour at progress areas. |
| 08/12/2025 | COT - HCPL - Sewer | N/A | Not Ready | |
| 10/15/2025 | COT - HCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | 10/15/25 Partial pass, pending lift on the SW corner about 15 ft. Dock level wall. |
| 09/02/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 9/2/25: reinforcement per approved plans at SW loading dock footers. Ok to proceed with concrete placement. |
| 08/07/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | Six light pole bases n North and East sides. |
| 11/17/2025 | COT - HCBU - Building Progress | N/A | Not Ready | Call in at finals. 11/17/2025 |
| 10/21/2025 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 1st Lift of veneer. |
| 11/25/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Plumbing above ceiling: domestic water lines at 1” and 1 1/2”; hose bibs from,building and at trash enclosure. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-1124-02135
Permit Description: New Retail Shell Bldg
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 10/23/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | balance of light poles and 60’ of UG Electric North of East pole. | |
| 10/29/2025 | COT - HCBU - Framing | Passed | ||
| 11/03/2025 | COT - HCPL - Yard Water Line | Passed | Ok to cover progress areas. | |
| 11/06/2025 | COT - HCPL - Rough Soil | Passed | Interior waste lines at 3” - 4”. Ok to cover progress areas. | |
| 11/17/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 11/17/2025 | COT - HCPL - Plumbing Roof Drains | Passed | ||
| 11/21/2025 | BULD - Electrical Clearance | Passed | 11/21/25: TEP ECO Clearance for 2150 E Broadway BL and 2150 E Broadway BL House Panel | |
| 11/25/2025 | COT - HCBU - Masonry Pregrout | Passed | Southwest portion,of building; decorative block topped out at 19’ 4”. Ok to place grout in progress areas. |