Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCPL - Plumbing Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2026 | COT - HCPL - Plumbing Progress | Passed | ||
| 11/17/2025 | COT - HCPL - Plumbing Progress | Partial Pass | Partial pass in wall 3/4” C/W up from U/G to HB3 at trash enclosure. HB1 on both East, west and south end in wall on test. Main water line 2” copper riser on test. Pending point of connection. 11/17/2025 |
|
| 11/25/2025 | COT - HCPL - Plumbing Progress | Partial Pass | Plumbing above ceiling: domestic water lines at 1” and 1 1/2”; hose bibs from,building and at trash enclosure. |