Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2583 N 1ST AV
Address NEW:
2583 N 1ST AV
Apply Date:
11/02/2022
Applicant:
Izet Bukvarevic
Description:
Remodel of Existing building for a new YOGA Studio.

Permit Reviews

Permit Number - TC-COM-1122-00027
Permit Status: Complete
Permit Description: Remodel of Existing building for a new YOGA Studio.
Start Date Submittal Complete Date Status  
11/02/2022 COMMERCIAL REVIEW - FULL v.1 11/30/2022 REQUIRES RESUBMIT Review Details
02/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/04/2024 APPROVED Review Details
04/18/2023 COMMERCIAL REVIEW - FULL v.3 04/18/2023 REQUIRES RESUBMIT Review Details
06/13/2023 COMMERCIAL REVIEW - FULL v.6 07/07/2023 APPROVED Review Details
01/24/2023 COMMERCIAL REVIEW - FULL v.2 01/27/2023 REQUIRES RESUBMIT Review Details
05/15/2023 COMMERCIAL REVIEW - FULL v.5 06/12/2023 REQUIRES RESUBMIT Review Details
04/26/2023 COMMERCIAL REVIEW - FULL v.4 05/05/2023 REQUIRES RESUBMIT Review Details
02/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-1122-00027
Permit Status: Complete
Permit Description: Remodel of Existing building for a new YOGA Studio.
Date Description Comments
02/16/2024 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
07/07/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
02/29/2024 WATER STERILIZATION REPORT IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1122-00027
Permit Description: Remodel of Existing building for a new YOGA Studio.
Total Completed Inspections - 14
Date Description Inspector Results Comments
08/30/2023 COT - LCEL - Electrical Intermediate Passed Levels #1 and #2, in wall electric in place, need to pull wiring.
08/31/2023 COT - HCPL - Rough Soil Passed Room numbers 103, 104, 105, 106, 107, 108, 110, and 111 abs 112. Stubbed out of building 11' for sewer connection. Okay to backfill. Shading required. 8/31/2023
09/21/2023 COT - LCPL - Plumbing Intermediate Passed
09/21/2023 COT - LCBU - Preslab Passed
11/01/2023 COT - HCEL - Electrical Intermediate Passed Electrical rough-in complete in shower rooms and lobby. Okay to insulate and install drywall.
11/01/2023 COT - HCBU - Framing Passed Rough framing for shower rooms and area separation walls is complete. Okay to insulate and install drywall.
11/01/2023 COT - HCPL - Plumbing Intermediate Passed Plumbing rough-in complete in shower area and under water pressure test. Okay to proceed with sheet rock and insulation.
11/01/2023 COT - LCME - Mechanical Intermediate Passed Mechanical rough-in above ceiling is complete. Okay to insulate and install drywall.
12/13/2023 BULD - Electrical Clearance Passed 5meters, Panel A, Panel B, Panel C, Panel D, And Panel E(House Panel). Phoned in to Marcia at 2:09.
02/09/2024 COT - LCBU - Framing Passed
02/09/2024 COT - LCEL - Electrical Final Passed
02/14/2024 COT - LCBU - Building Final Passed
02/14/2024 COT - LCME - Mechanical Final Passed
02/14/2024 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CONS-4WALLS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-5_PLAN_SET_V2.PDF DOCUMENTS VIEW
CONS-5_PLAN_SET_V2.PDF DOCUMENTS VIEW
CONS-1_PLAN_SET_V1.PDF DOCUMENTS VIEW