Inspection Status: Partial Pass

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Permit Number - TC-COM-0824-01656

Inspection Description - COT - HCBU - Excavation/Rebar/Zoning 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
05/01/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 5/1/25: reinforcement per plan at Bridge crane footings (4) in Area B and (4) in Area D. Ok to proceed with concrete placement.
05/12/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 5/1/25: reinforcement per plan at Bridge crane footings (4) in Area B and (4) in Area D. Ok to proceed with concrete placement.
5/1/25: reinforcement per plan at Bridge crane footings (4) in Area B and (4) in Area D. Ok to proceed with concrete placement.
5/12/25: reinforcement per plan at Tank Structure foundation (#6 12" o.c E.W T&B), House keep pad reinforced per plans ok to proceed.
05/15/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass
05/23/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 5-23-25, reinforcement for 13x13x3' deep motion table isolation pad in rm. 106 at Building 805 together with vib.shaker table foundation pad in rm. 109 at 6x 10x 1' deep verified as per approved plans-Okay to pour concrete. (3rd. Party-Western Tech inspector approved inspection).
05/23/2025 COT - HCBU - Excavation/Rebar/Zoning  Re-inspection required 5-23-25, called point of contact at 1127 hours but received no answer. Arrived on site at approximately 1131 hours-waited 10 minutes and left.
07/24/2025 COT - HCBU - Excavation/Rebar/Zoning  Passed