Permit: TC-COM-0626-00799
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2730 E DREXEL RD BLDG 2 UNIT 2110
Address NEW:
2730 E DREXEL RD BLDG 2 UNIT 2110
Apply Date:
06/01/2026
Applicant:
Amy Cotner
Description:
Tenant Improvement to Suite 2110. Scope of work includes select demo of existing office for revised office layout, new demising walls in existing warehouse space to create a new showroom. Additional bathroom for mercantiel use and new IT room. No work proposed in existing warehouse.
Permit Reviews
Permit Number - TC-COM-0626-00799
Permit Status: Complete
Permit Description: Tenant Improvement to Suite 2110. Scope of work includes select demo of existing office for revised office layout, new demising walls in existing warehouse space to create a new showroom. Additional bathroom for mercantiel use and new IT room. No work proposed in existing warehouse.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/17/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | N/A | REQUIRES RESUBMIT |
| 07/08/2026 | COMMERCIAL REVIEW - FULL v.2 | 07/30/2026 | APPROVED |
| 06/04/2026 | COMMERCIAL REVIEW - FULL v.1 | 06/26/2026 | REQUIRES RESUBMIT |
| 09/10/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/10/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0626-00799
Permit Status: Complete
Permit Description: Tenant Improvement to Suite 2110. Scope of work includes select demo of existing office for revised office layout, new demising walls in existing warehouse space to create a new showroom. Additional bathroom for mercantiel use and new IT room. No work proposed in existing warehouse.
| Date | Description | Comments |
|---|---|---|
| 06/26/2026 | AIR BALANCING REPORT IS REQUIRED. | |
| 07/29/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/04/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/26/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0626-00799
Permite Description: Tenant Improvement to Suite 2110. Scope of work includes select demo of existing office for revised office layout, new demising walls in existing warehouse space to create a new showroom. Additional bathroom for mercantiel use and new IT room. No work proposed in existing warehouse.
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2026 | COT - LCBU - Framing | N/A | Partial Pass | 8/14/2026 Partial pass. Reviewed RFI for both sides of full height walls. Will be submitted prior to final. East furred out wall of show room approved. Stiffened have been added for both IT room and Office 126. Screws have been attached to metal stud for end of IT wall. Pending framing for showroom restroom. Drywall screw inspection approved inside west wall of show room. Okay to proceed all progress areas. |
| 08/13/2026 | COT - LCBU - Preslab | N/A | Partial Pass | 8-13-26: reinforcement for pour back at 2 plumbing areas verified per plans/details. Okay for concrete placement. Note: submit 3rd party epoxy report to the city for review & approval. |
| 08/24/2026 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | 8/24/2026 Partial pass. Exhaust for bathroom approved. |
| 08/24/2026 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 8/24/2026 in wall at water heater/ drinking fountain location approved. Okay to proceed with progress areas. |
| 08/24/2026 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 8/24/2026 in wall at water heater/ drinking fountain location approved. Okay to proceed with progress areas. |
| 09/03/2026 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
| 09/03/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 9-3-26: not applicable. |
| 09/03/2026 | BULD - Electrical Clearance | N/A | Not Applicable | 9-3-26: not applicable. |
| 09/10/2026 | ENGR Engineering Final | N/A | Partial Pass | Dumpster and Porta potty are scheduled for pick up. Conditions are satisfied. - One section of store front door and windows are not complete but, this is an additional entryway. Other entryways are functional. Restrict access to this area for safety until finished. OK to apply for level 2 TCO. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0626-00799
Permit Description: Tenant Improvement to Suite 2110. Scope of work includes select demo of existing office for revised office layout, new demising walls in existing warehouse space to create a new showroom. Additional bathroom for mercantiel use and new IT room. No work proposed in existing warehouse.
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2026 | COT - LCBU - Framing | Passed | 8-28-26: north exterior side of warehouse, east wall and restroom at showroom approved for tape & texture. | |
| 09/01/2026 | COT - LCBU - Preslab | Passed | 9-1-26: slab on grade at front entry approved to pour. | |
| 09/01/2026 | COT - LCME - Mechanical Intermediate | Passed | 9-1-26: mechanical intermediate approved. | |
| 09/01/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 9-1-26: electrical above ceiling approved. | |
| 09/01/2026 | COT - LCEL - Electrical Intermediate | Passed | 9-1-26: electrical intermediate approved. | |
| 09/01/2026 | COT - LCPL - Plumbing Intermediate | Passed | 9-1-26: plumbing intermediate approved. | |
| 09/03/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 09/08/2026 | TRSP - ROW - Notice of Completion | Passed | ||
| 09/09/2026 | COT - FCON - Fire - Final | Passed | ||
| 09/10/2026 | COT - LCBU - Building Above Ceiling | Passed | 9/10/26: building above ceiling approved. | |
| 09/10/2026 | COT - LCEL - Electrical Final | Passed | 9/10/26: electrical final approved. | |
| 09/11/2026 | COT - LCME - Mechanical Final | Passed | 9/11/26: mechanical final approved. | |
| 09/11/2026 | COT - LCPL - Plumbing Final | Passed | 9/11/26: plumbing final approved. | |
| 09/18/2026 | ENGR Engineering Final | Passed | ||
| 09/18/2026 | COT - LCBU - Building Final | Passed | 9/18/26: Architect's letter reference water heater attached to permit. All corrections made-Building final approved. Okay to apply for a C of O. |