Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - LCBU - Building Final 

Date Description Inspector Results Comments
09/10/2026 COT - LCBU - Building Final  Re-inspection required 9/10/26: water sterilization & air balance report required. Submit documents to the city for review & approval. Pending glass window/door at showroom, label in junction box at east showroom wall, water heater not installed per P7.01/1.
09/11/2026 COT - LCBU - Building Final  Partial Pass 9/11/26: architect to submit a letter to the city documenting water heater installation to remain as is without details from P7.01/1. Pending glass & door window installation. All pending conditions satisfied-Okay to apply for a level 2 TCO.
09/18/2026 COT - LCBU - Building Final  Passed 9/18/26: Architect's letter reference water heater attached to permit. All corrections made-Building final approved. Okay to apply for a C of O.