Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0624-01182
Permit Details
Apply Date:
06/20/2024
Applicant:
Vince Catalano
Description:
Tenant Improvement for La Michoacana
Permit Reviews
Permit Number - TC-COM-0624-01182
Permit Status: Issued
Permit Description: Tenant Improvement for
La Michoacana
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/21/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 07/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0624-01182
Permit Status: Issued
Permit Description: Tenant Improvement for
La Michoacana
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/08/2024 | AIR BALANCING REPORT IS REQUIRED. |
07/08/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
07/08/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. |
07/08/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0624-01182
Permit Status: Issued
Permit Description: Tenant Improvement for
La Michoacana
Date | Description | Comments |
---|---|---|
07/09/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
07/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0624-01182
Permite Description: Tenant Improvement for
La Michoacana
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/04/2024 | COT - LCBU - Framing | N/A | Re-inspection required | 8/8/24: diagonal bracing required at new bathroom framing, pony wall not installed at time of inspection, damaged studs must be replaced at existing bathroom. 9/4/24: no access to site. |
09/05/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
09/05/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
09/05/2024 | COT - LCME - Mechanical Above Ceiling | N/A | Re-inspection required | 9/5/24: seismic wire required at all registers and light fixtures, seismic wire required every 4' o.c at grid ceiling, properly support flex duct, properly support MC cable off of Grid. Please provide ladder for inspection. |
08/08/2024 | COT - LCEL - Electrical Intermediate | N/A | Re-inspection required | 7/8/24: missing receptacles throughout in wall, |
09/05/2024 | COT - LCEL - Electrical Above Ceiling | N/A | Re-inspection required | 9/5/24: seismic wire required at all registers and light fixtures, seismic wire required every 4' o.c at grid ceiling, properly support flex duct, properly support MC cable off of Grid. Please provide ladder for inspection. |
09/05/2024 | COT - LCPL - Plumbing Above Ceiling | N/A | Re-inspection required | 9/5/24: seismic wire required at all registers and light fixtures, seismic wire required every 4' o.c at grid ceiling, properly support flex duct, properly support MC cable off of Grid. Please provide ladder for inspection. |
09/05/2024 | COT - LCME - Mechanical Intermediate | N/A | Re-inspection required | 9/5/24: seismic wire required at all registers and light fixtures, seismic wire required every 4' o.c at grid ceiling, properly support flex duct, properly support MC cable off of Grid. Please provide ladder for inspection. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0624-01182
Permit Description: Tenant Improvement for
La Michoacana
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2024 | COT - LCBU - Preslab | Passed | 7/29/24: Preslab passed ok to proceed | |
08/08/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
09/05/2024 | COT - LCBU - Framing | Passed | ||
09/05/2024 | COT - LCPL - Rough Soil | Passed | 7/26/24: plumbing underground per plans. Partial pass pending grease interceptor. 9/5/24: Grease interceptor installed and under test ok to backfill. Shading required. |
|
09/05/2024 | COT - LCEL - Electrical Intermediate | Passed |