Permit: TC-COM-0524-00998
Permit Details
Apply Date:
05/23/2024
Applicant:
Jocelyn Retamoza Gonzvar
Description:
THIS PROJECT TENANT IMPROVEMENT IN THREE DIFFERENT PHASES , 1ST PHASE IS DOING A LIGHT TENANT IMPROVEMENT TO THE INTERIOR TO GET A CERTIFICATE OF OCCUPANCY FOR THE MARKET AND A SMALL OFFICE FOR THE MARKET. NO SITE WORK. IN DOING SO 3 NEW ADA RESTROOMS WILL BE ADDED ALONG W/ ADA DRINKING FOUNTAIN. REV1_Owner decided to remove the damaged hardlid ceiling. Contractor verified foam roofing and full batt insulation w/ painted scrim installed. REV2: Added emergency egress lights.
Permit Reviews
Permit Number - TC-COM-0524-00998
Permit Status: Complete
Permit Description: THIS PROJECT TENANT IMPROVEMENT IN THREE DIFFERENT PHASES , 1ST PHASE IS DOING A LIGHT TENANT IMPROVEMENT TO THE INTERIOR TO GET A CERTIFICATE OF OCCUPANCY FOR THE MARKET AND A SMALL OFFICE FOR THE MARKET. NO SITE WORK. IN DOING SO 3 NEW ADA RESTROOMS WILL BE ADDED ALONG W/ ADA DRINKING FOUNTAIN.
REV1_Owner decided to remove the damaged hardlid ceiling. Contractor verified foam roofing and full batt insulation w/ painted scrim installed.
REV2: Added emergency egress lights.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2024 | COMMERCIAL REVIEW - FULL v.1 | 06/27/2024 | REQUIRES RESUBMIT |
| 04/03/2026 | SPECIAL INSPECTION REVIEW v.1 | 04/06/2026 | APPROVED |
| 08/22/2024 | RESTAMP - COMMERCIAL v.1 | 08/22/2024 | APPROVED |
| 07/24/2024 | COMMERCIAL REVIEW - FULL v.2 | 08/22/2024 | APPROVED |
| 02/12/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 03/09/2026 | APPROVED |
| 12/09/2025 | COMMERCIAL REVIEW - FULL v.1 | 12/26/2025 | APPROVED |
| 03/13/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/16/2026 | APPROVED |
| 03/16/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/17/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0524-00998
Permit Status: Complete
Permit Description: THIS PROJECT TENANT IMPROVEMENT IN THREE DIFFERENT PHASES , 1ST PHASE IS DOING A LIGHT TENANT IMPROVEMENT TO THE INTERIOR TO GET A CERTIFICATE OF OCCUPANCY FOR THE MARKET AND A SMALL OFFICE FOR THE MARKET. NO SITE WORK. IN DOING SO 3 NEW ADA RESTROOMS WILL BE ADDED ALONG W/ ADA DRINKING FOUNTAIN.
REV1_Owner decided to remove the damaged hardlid ceiling. Contractor verified foam roofing and full batt insulation w/ painted scrim installed.
REV2: Added emergency egress lights.
| Date | Description | Comments |
|---|---|---|
| 06/25/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 08/22/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 05/28/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/22/2024 | INFORMATION TO OWNER - Ensure that Handicap parking stall/striped accessible route/signs are complying to ICC/ANSI A117.1 | |
| 08/22/2024 | Masonry Inspection Report submittal review is required. | |
| 06/27/2024 | NESHAP Permit is required. (Utilized with commercial demolition permits) | |
| 08/22/2024 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. | |
| 06/25/2024 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 08/22/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0524-00998
Permite Description: THIS PROJECT TENANT IMPROVEMENT IN THREE DIFFERENT PHASES , 1ST PHASE IS DOING A LIGHT TENANT IMPROVEMENT TO THE INTERIOR TO GET A CERTIFICATE OF OCCUPANCY FOR THE MARKET AND A SMALL OFFICE FOR THE MARKET. NO SITE WORK. IN DOING SO 3 NEW ADA RESTROOMS WILL BE ADDED ALONG W/ ADA DRINKING FOUNTAIN.
REV1_Owner decided to remove the damaged hardlid ceiling. Contractor verified foam roofing and full batt insulation w/ painted scrim installed.
REV2: Added emergency egress lights.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2025 | COT - LCME - Mechanical Intermediate | N/A | Re-inspection required | 10-9-25: block all registers, seal all horizontal/vertical penetrations penetrations, add spacers to mc cables and remove off trusses, add rubber bushings to pex lines and DWV piping running through metal framing. |
| 10/09/2025 | COT - LCEL - Electrical Above Ceiling | N/A | Re-inspection required | 10-9-25: block all registers, seal all horizontal/vertical penetrations penetrations, add spacers to mc cables and remove off trusses, add rubber bushings to pex lines and DWV piping running through metal framing. |
| 12/12/2025 | COT - LCPL - Plumbing Roof Drains | N/A | Not Applicable | 12-12-25: not applicable. No roof drains on scope of work. |
| 10/09/2025 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 10-9-25: in wall electrical for phase 1 verified per plans. Okay to continue construction at progress areas. |
| 10/09/2025 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | 10-9-25: block all registers, seal all horizontal/vertical penetrations penetrations, add spacers to mc cables and remove off trusses, add rubber bushings to pex lines and DWV piping running through metal framing. |
| 01/06/2026 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | Relocate water heater installed in bathroom. 1/6/2026 |
| 01/15/2026 | COT - FCON - Fire - Final | N/A | Re-inspection required | Address shall be on the building, Fire extinguisher shall be mounted on wall, Main building: front exit the wrought iron gate's deadbolt shall not be a keyed lock on the inside, the southside exit door shall swing in the direction of egress travel, northside exit door exit sign shall be moved to the exterior, exit discharge lights shall be added above exit doors. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0524-00998
Permit Description: THIS PROJECT TENANT IMPROVEMENT IN THREE DIFFERENT PHASES , 1ST PHASE IS DOING A LIGHT TENANT IMPROVEMENT TO THE INTERIOR TO GET A CERTIFICATE OF OCCUPANCY FOR THE MARKET AND A SMALL OFFICE FOR THE MARKET. NO SITE WORK. IN DOING SO 3 NEW ADA RESTROOMS WILL BE ADDED ALONG W/ ADA DRINKING FOUNTAIN.
REV1_Owner decided to remove the damaged hardlid ceiling. Contractor verified foam roofing and full batt insulation w/ painted scrim installed.
REV2: Added emergency egress lights.
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2025 | COT - LCPL - Rough Soil | Passed | Domestic water line and sewer line connected to main sewer line | |
| 08/28/2025 | COT - LCEL - Electrical Underground | Passed | Ok to cover progress areas. | |
| 12/11/2025 | BULD - Electrical Clearance | Passed | 12/11/25 TEP CLEARANCE: INCR, talked with Natalie she will update the address to reflect 4001 on her end as it was coming up as 4009 unit A. |
|
| 12/12/2025 | COT - LCME - Mechanical Intermediate | Passed | 12-12-25: mechanical intermediates approved. | |
| 12/12/2025 | COT - LCEL - Electrical Above Ceiling | Passed | 12-12-25: approved. | |
| 12/12/2025 | COT - LCPL - Yard Water Line | Passed | 12-12-25: previously inspected & approved. | |
| 01/06/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 01/06/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 01/06/2026 | COT - LCEL - Electrical Final | Passed | 1/6/2026 all corrections have been made. No additional items. | |
| 01/06/2026 | COT - LCME - Mechanical Final | Passed | 1/6/2026 all corrections have been made. No additional items. | |
| 01/06/2026 | COT - LCEL - Grounding/Bonding | Passed | ||
| 03/03/2026 | COT - LCPL - Plumbing Final | Passed | 3-3-26: plumbing final approved. | |
| 03/27/2026 | ENGR Engineering Final | Passed | ||
| 03/27/2026 | COT - FCON - Fire - Final | Passed | ||
| 04/03/2026 | COT - LCBU - Building Final | Passed | 4-3-26: Building final approved- okay for a Level 4 TCO. |