Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2026 | ENGR Engineering Final | Not Ready | Accessibility restricted. Fencing needs to be moved, so it is not blocking emergency services or Exits and Accessible Routes. | |
| 03/05/2026 | ENGR Engineering Final | Partial Pass | Okay for level 1 TCO Reschedule this inspection again for when south Store Front Door is fully Functional. Add a sticker inside this Doorframe stating Door must remain unlocked during business hours. |
|
| 03/27/2026 | ENGR Engineering Final | Passed |