Permit: TC-COM-0523-01387
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2902 N EL BURRITO AV
Address NEW:
2902 N EL BURRITO AV
Apply Date:
05/25/2023
Applicant:
Bryan Hill
Description:
Interior Remodel Botanica Warehouse
Permit Reviews
Permit Number - TC-COM-0523-01387
Permit Status: Complete
Permit Description: Interior Remodel
Botanica Warehouse
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/05/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/14/2023 | REQUIRES RESUBMIT |
| 05/26/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/27/2023 | REQUIRES RESUBMIT |
| 07/24/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/24/2023 | APPROVED |
| 04/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/04/2024 | APPROVED |
| 07/24/2023 | RESTAMP - COMMERCIAL v.1 | 07/25/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0523-01387
Permit Status: Complete
Permit Description: Interior Remodel
Botanica Warehouse
| Date | Description | Comments |
|---|---|---|
| 04/02/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 07/07/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 04/02/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01387
Permit Description: Interior Remodel
Botanica Warehouse
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2023 | COT - HCBU - Framing | Passed | ||
| 08/09/2023 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 08/09/2023 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 08/09/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
| 10/19/2023 | COT - HCPL - Plumbing Progress | Passed | Gas pressure test. | |
| 11/13/2023 | COT - HCPL - Plumbing Above Ceiling | Passed | 11/13/23: plumbing above ceiling passed. Ok to proceed | |
| 12/08/2023 | COT - HCME - Mechanical Progress | Passed | 12/8/2023. Mechanical above ceiling in warehouse approved. Corrections were made. | |
| 01/17/2024 | COT - HCPL - Yard Water Line | Passed | ||
| 02/05/2024 | COT - HCEL - Electrical Progress | Passed | Electrical rough-in is complete, light fixtures are installed in grid ceiling and properly wired to structural members, and all wiring is ran to electrical panel waiting on TEP Connection from transformer. Okay to install grid ceiling tiles. | |
| 02/05/2024 | COT - HCME - Mechanical Intermediate | Passed | Mechanical rough-in is complete, trim out of registers in grid ceiling is complete, thermostats are installed on walls, and all ductwork is properly supported in plenum. | |
| 02/05/2024 | COT - HCBU - Building Progress | Passed | 2/5/24: Inspection is for main water line from meter to back flow preventer and then to building water supply line. Okay to shade pipes and backfill trench, and to wrap pipes with insulation to prevent pipes from freezing. | |
| 02/05/2024 | BULD - Electrical Clearance | Passed | Sweep and conduit is installed on electrical panel, trench is properly dug from building to transformer pad, and ground wires are properly installed. Okay to energize system. ECO Clearance issued for new panel and meter box. | |
| 02/05/2024 | COT - BULD - SWG Clearance | Passed | Gas meter is placed. Okay to re-connect gas to building. SWG Clearance issued. | |
| 03/26/2024 | COT - FCON - Fire - Final | Passed | ||
| 03/26/2024 | ENGR Engineering Final | Passed | ||
| 03/26/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/03/2024 | COT - HCBU - Building Final | Passed | Corrections were made. Air and balance report and chlorination report uploaded and are under review in the portal. 4/3/2024 | |
| 04/03/2024 | COT - HCPL - Plumbing Final | Passed | Corrections were made. Air and balance report and chlorination report uploaded and are under review in the portal. 4/3/2024 | |
| 04/03/2024 | COT - HCME - Mechanical Final | Passed | Corrections were made. Air and balance report uploaded and are under review in the portal. 4/3/2024 | |
| 04/03/2024 | COT - HCEL - Electrical Final | Passed |