Permit: TC-COM-0523-01387

Parcel: 10706113A

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Building Progress

Date Description Inspector Results Comments
01/17/2024 COT - HCBU - Building Progress Partial Pass Inspection is for main water line. 1/17/2024
02/05/2024 COT - HCBU - Building Progress Passed 2/5/24: Inspection is for main water line from meter to back flow preventer and then to building water supply line. Okay to shade pipes and backfill trench, and to wrap pipes with insulation to prevent pipes from freezing.
08/09/2023 COT - HCBU - Building Progress Partial Pass Looked at rough soil for fixtures. DWV filled under pressure. Partial pending pre slab. 8/9/2023
08/24/2023 COT - HCBU - Building Progress Partial Pass Dowels every 16" on center offset. Dirt compacted and plumbing wrapped. Pre slab inspection. Okay for concrete placement. 8/24/2023