Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 01/17/2024 |
COT - HCBU - Building Progress |
|
Partial Pass |
Inspection is for main water line. 1/17/2024 |
| 02/05/2024 |
COT - HCBU - Building Progress |
|
Passed |
2/5/24: Inspection is for main water line from meter to back flow preventer and then to building water supply line. Okay to shade pipes and backfill trench, and to wrap pipes with insulation to prevent pipes from freezing. |
| 08/09/2023 |
COT - HCBU - Building Progress |
|
Partial Pass |
Looked at rough soil for fixtures. DWV filled under pressure. Partial pending pre slab. 8/9/2023 |
| 08/24/2023 |
COT - HCBU - Building Progress |
|
Partial Pass |
Dowels every 16" on center offset. Dirt compacted and plumbing wrapped. Pre slab inspection. Okay for concrete placement. 8/24/2023 |