Permit: TC-COM-0426-00491
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
4515 E 22ND ST
Address NEW:
4515 E 22ND ST
Apply Date:
04/08/2026
Applicant:
Meg Wamsley
Description:
Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
Permit Reviews
Permit Number - TC-COM-0426-00491
Permit Status: Needs resubmittal
Permit Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2026 | COMMERCIAL REVIEW - FULL v.2 | 05/13/2026 | REQUIRES RESUBMIT |
| 05/13/2026 | COMMERCIAL REVIEW - FULL v.3 | 05/19/2026 | APPROVED |
| 07/24/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 08/13/2026 | REQUIRES RESUBMIT |
| 04/10/2026 | COMMERCIAL REVIEW - FULL v.1 | 04/22/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0426-00491
Permit Status: Needs resubmittal
Permit Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/21/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
| 05/01/2026 | Truss/Joist Design plans, Layout and Framing Plan/Details must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-COM-0426-00491
Permit Status: Needs resubmittal
Permit Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
| Date | Description | Comments |
|---|---|---|
| 04/10/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/10/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0426-00491
Permite Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2026 | COT - LCBU - Roof Nailing | N/A | Partial Pass | 6/30/26: roof nailing approved at risk. Revised set must be complete and all pages must be present for revision. TJI package required |
| 06/30/2026 | ENGR Engineering Final | N/A | Not Ready | Work is not complete. Recall Engineering Final once work is complete. |
| 06/30/2026 | COT - LCEL - Electrical Above Ceiling | N/A | Re-inspection required | 6-30-26: contractor not on site. Reschedule at your convenience. |
| 07/20/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 07/20/2026 | COT - LCBU - Framing | N/A | Partial Pass | 7/20/26: metal framing approved at Office 1 and office 2, metal framing approved at restroom 1 and restroom 2. (Per IBC 1210.2.1 In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches (102 mm). Per IBC 1210.2.2 Walls and partitions within 2 feet (610 mm) of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet (1219 mm) above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. Exception: This section does not apply to the following buildings and spaces: 1.Dwelling units and sleeping units. 2.Toilet rooms that are not for use by the general public and that have not more than one water closet. Accessories such as grab bars, towel bars, paper dispensers and soap dishes, provided on or within walls, shall be installed and sealed to protect structural elements from moisture.) |
| 07/20/2026 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 7/20/26: Electrical in-Wall approved at Office 1 and office 2, electrical in wall approved at restroom 1 and restroom 2, ok to cover walls in offices, ok to one-side walls at restrooms. |
| 07/28/2026 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | Partial pass for exhaust fans in bathrooms; will need to see duct mastic for the office areas. |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0426-00491
Permit Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2026 | COT - HCBU - Interior Shear Bracing | Passed | PLEASE CALL REID HOGE, 30 MINUTES BEFORE ARRIVAL AT 520-990-0420 7/23/2026 Verified nail schedule at 5/8" gypsum, okay to tape and texture. |
|
| 07/28/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 07/28/2026 | COT - LCPL - Plumbing Intermediate | Passed |