Permit: TC-COM-0426-00491
Permit Details
Apply Date:
04/08/2026
Applicant:
Meg Wamsley
Description:
Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
Permit Reviews
Permit Number - TC-COM-0426-00491
Permit Status: Issued
Permit Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2026 | COMMERCIAL REVIEW - FULL v.2 | 05/13/2026 | REQUIRES RESUBMIT |
| 08/18/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 09/04/2026 | APPROVED |
| 05/13/2026 | COMMERCIAL REVIEW - FULL v.3 | 05/19/2026 | APPROVED |
| 07/24/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 08/13/2026 | REQUIRES RESUBMIT |
| 04/10/2026 | COMMERCIAL REVIEW - FULL v.1 | 04/22/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0426-00491
Permit Status: Issued
Permit Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/21/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
| 05/01/2026 | Truss/Joist Design plans, Layout and Framing Plan/Details must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-COM-0426-00491
Permit Status: Issued
Permit Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
| Date | Description | Comments |
|---|---|---|
| 04/10/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/10/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0426-00491
Permite Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2026 | ENGR Engineering Final | N/A | Not Ready | Work is not complete. Recall Engineering Final once work is complete. |
| 07/20/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 09/17/2026 | COT - LCBU - Framing | N/A | Partial Pass | 9/17/2026 partial pass. The correction of TJI'S have been completed. |
| 07/20/2026 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 7/20/26: Electrical in-Wall approved at Office 1 and office 2, electrical in wall approved at restroom 1 and restroom 2, ok to cover walls in offices, ok to one-side walls at restrooms. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0426-00491
Permit Description: Rev 1 - Started 07.24.2026 ** FIRE DAMAGE REPAIR
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2026 | COT - HCBU - Interior Shear Bracing | Passed | PLEASE CALL REID HOGE, 30 MINUTES BEFORE ARRIVAL AT 520-990-0420 7/23/2026 Verified nail schedule at 5/8" gypsum, okay to tape and texture. |
|
| 07/28/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 07/28/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 08/19/2026 | COT - LCME - Mechanical Intermediate | Passed | ||
| 08/19/2026 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 09/17/2026 | COT - LCBU - Roof Nailing | Passed | 9/17/2026 approved. Revision of TJI'S have been submitted and approved. | |
| 09/24/2026 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 10/01/2026 | BULD - Electrical Clearance | Passed | INCR TEP |