Inspection Status: Re-inspection required
Inspection History: COT - LCPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2026 |
COT - LCPL - Plumbing Final |
|
Re-inspection required |
10/27/26: label all disconnects at rooftop, have engineer submit a letter to the city for 3-pole breakers at subpanel, label subpanel, label above ceiling junction boxes, seal low conduit conduit at decking near front entrance, seal exterior wall at unisex restroom, seal water closet at ADA restroom, install ADA restroom sign at 48" to the braille, complete sign lighting, schedule all remaining inspections when ready, submit all 3rd party reports including air balance to the city for review/approval. |
| 10/28/2026 |
COT - LCPL - Plumbing Final |
|
Re-inspection required |
Clear chlorination condition. |
|
COT - LCPL - Plumbing Final |
|