Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2585 E 36TH ST
Address NEW:
2585 E 36TH ST
Apply Date:
04/17/2024
Applicant:
Lisa Bowers
Description:
TI for Boys & Girls Club of Tucson. New steel stud framing for interior partitions and new interior finishes. New ceiling with acoustical tile and framed gypsum board.

Permit Reviews

Permit Number - TC-COM-0424-00699
Permit Status: Complete
Permit Description: TI for Boys & Girls Club of Tucson. New steel stud framing for interior partitions and new interior finishes. New ceiling with acoustical tile and framed gypsum board.
Start Date Submittal Complete Date Status  
04/19/2024 COMMERCIAL REVIEW - FULL v.1 05/16/2024 REQUIRES RESUBMIT Review Details
07/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/21/2025 APPROVED Review Details
06/26/2024 RESTAMP - COMMERCIAL v.1 06/27/2024 APPROVED Review Details
04/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/24/2025 APPROVED Review Details
06/11/2024 COMMERCIAL REVIEW - FULL v.2 06/17/2024 REQUIRES RESUBMIT Review Details
07/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/16/2025 REQUIRES RESUBMIT Review Details
03/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/01/2025 APPROVED Review Details
06/26/2024 COMMERCIAL REVIEW - FULL v.3 06/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0424-00699
Permit Status: Complete
Permit Description: TI for Boys & Girls Club of Tucson. New steel stud framing for interior partitions and new interior finishes. New ceiling with acoustical tile and framed gypsum board.
Date Description Comments
06/26/2024 AIR BALANCING REPORT IS REQUIRED.
06/26/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
04/01/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/26/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/26/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/26/2024 Post-Installed Anchor Inspection Report is required.
06/26/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0424-00699
Permite Description: TI for Boys & Girls Club of Tucson. New steel stud framing for interior partitions and new interior finishes. New ceiling with acoustical tile and framed gypsum board.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
09/10/2024 COT - HCPL - Rough Soil N/A Partial Pass 9/10/2024 inspection is for pouring back saw cuts for underground plumbing. dowels every 32 on center staggered plumbing wrapped. Okay for concrete placement.
07/23/2024 BULD - Electrical Clearance N/A Not Ready Not ready. Courtesy inspection. 7/23/2024
12/10/2024 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass 12/10/24: plumbing above ceiling in restrooms 126 and 125 passed. Ok to proceed.
04/25/2025 COT - HCEL - Grounding/Bonding N/A Not Applicable
12/10/2024 COT - HCPL - Plumbing Intermediate N/A Partial Pass All underground approved. Okay to backfill shading required. Pending grease interceptor and new location for floor drain. 8/23/2024
9/9/24: new location for floor drain passed ok to proceed. Pending grease interceptor.
10/8/24: canceled by contractor
12/10/24: plumbing above ceiling in restrooms 126 and 125 passed. Ok to proceed.
COT - FCON - Fire - Final N/A Not Ready
04/25/2025 ENGR Engineering Final N/A Not Ready Fencing and steel retaining structures are on site. Not permitted? Precilla at Realm Landscaping has been notified to call Sonya Bermudez in order to review.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0424-00699
Permit Description: TI for Boys & Girls Club of Tucson. New steel stud framing for interior partitions and new interior finishes. New ceiling with acoustical tile and framed gypsum board.
Total Completed Inspections - 25
Date Description Inspector Results Comments
08/30/2024 COT - HCEL - Electrical Underground Passed
09/19/2024 COT - HCPL - Rough Soil Passed Grease interceptor with 2” - 4” waste lines at North side of structure. Ok to cover progress areas
12/03/2024 COT - HCBU - Framing Passed Ok to insulate and Sheetrock remaining,walls throughout. Offices and activity rooms above ceilings: ensure fire sprinkler heads area in all rooms. Ok to Sheetrock ceilings.
02/18/2025 BULD - Electrical Clearance Passed Not ready. Courtesy inspection. 7/23/2024
2/18/25: ECO TEP CLEARANCE approved for 2585 E 36th st
03/03/2025 COT - HCME - Kitchen Hood Passed 3/3/25: kitchen hood duct smoke test passed.
03/04/2025 COT - BULD - SWG Clearance Passed 3-4-25, okay to energize meter. Clearance issued to SWG.
03/04/2025 COT - HCPL - Gas Pressure Test Passed 3-4-25, gas pressure test approved.
03/17/2025 COT - HCEL - Electrical Above Ceiling Passed
03/17/2025 COT - HCME - Mechanical Above Ceiling Passed
03/17/2025 COT - HCPL - Plumbing Above Ceiling Passed
04/25/2025 COT - FCON - Sprinkler - Final Passed
04/25/2025 COT - HCEL - Electrical Intermediate Passed
04/25/2025 COT - HCBU - Preslab Passed
04/24/2025 TRSP - ROW - Final/Close-Out Passed
04/25/2025 COT - HCPL - Plumbing Intermediate Passed
04/25/2025 COT - HCME - Mechanical Intermediate Passed
05/09/2025 COT - FCON - Alarm - Final Passed
05/23/2025 COT - FCON - Fire - Final Passed
05/27/2025 COT - HCBU - Building Above Ceiling Passed
05/27/2025 COT - HCBU - Building Final Passed
05/27/2025 COT - HCEL - Electrical Final Passed
05/27/2025 COT - HCME - Mechanical Final Passed
05/27/2025 COT - HCPL - Gas Final Passed No gas clearance required. Service is active.
05/27/2025 COT - HCPL - Plumbing Final Passed
05/27/2025 ENGR Engineering Final Passed There are some stockpiles adjacent to the parking area in the park for the landscaping permit TD-DEV-0525-00140. They are not affecting access or safety for work related to this permit.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
BOYS - GIRLS CLUB - WATER CHLORINATION REPORT-2025-04-23_V1.PDF DOCUMENTS VIEW
BOYS - GIRLS CLUB - TAB REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V3.PDF DOCUMENTS VIEW
BOYSANDGIRLSTI_CALCULATIONS_V2.PDF DOCUMENTS VIEW
SIC-2024-06-25_V1.PDF DOCUMENTS VIEW