Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel130055920
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningR-1
Tucson WardWard 5
Flood Related InformationFEMA Floodplain Area
Tucson Registered NeighborhoodPueblo Gardens
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 2585 E 36TH ST
Date - 08/17/2026 1:48 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-56-29 Southside 1650 2687

Permits

Address: 2585 E 36TH ST
Date - 08/17/2026 1:48 a.m.
Total Number Of Permits - (31)
Permit Status Apply Date Expired Date Unit Type Description
TF-FCP-1024-00881 Complete 10/15/2024 04/23/2025 Fire Construction Permit Fire Alarm Voice Evac System
TF-FCP-0924-00792 Complete 09/16/2024 07/29/2025 Fire Construction Permit Installation of a CaptiveAire TANK fire suppression system for a kitchen hood.
TF-FCP-0824-00730 Complete 08/29/2024 04/14/2025 Fire Construction Permit Underground fireline permit
TF-FCP-0824-00625 Complete 08/05/2024 08/15/2025 Fire Construction Permit Installation of wet pipe sprinkler system.
TD-DEV-0525-00140 Awaiting Submittal 05/19/2025 N/A Development Package Landscaping for the Boys & Girls Clubs of Tucson, Holmes-Tuttle Clubhouse
TR-UTL-0424-00819 Complete 04/18/2024 05/29/2024 Right-of-Way (ROW) - Utility Installing 6" fire protection service
TC-COM-0424-00699 Complete 04/17/2024 01/14/2026 Commercial Building TI for Boys & Girls Club of Tucson. New steel stud framing for interior partitions and new interior finishes. New ceiling with acoustical tile and framed gypsum board.
TF-FCP-0425-00295 Complete 04/09/2025 10/15/2025 Fire Construction Permit *EXPEDITE* Titan Alarm is providing monitoring via a cellular communicator to the new fire system that was installed.
TC-COM-0224-00317 Complete 02/19/2024 07/13/2026 Commercial Building Remodel bathroom structure at existing Pueblo Gardens Park(
TD-DEV-0224-00026 Approved 02/01/2024 06/18/2029 Development Package Restricted Access - New sidewalk at existing Pueblo Gardens Park
TC-DMO-0124-00017 Complete 01/31/2024 07/29/2024 Demolition Permit Interior only demo
DP15-0004 Complete 01/14/2015 04/16/2023 Development Package PARK IMPROVEMENTS
T06AN00754 ISSUED 07/14/2006 N/A ADDRNEW
T06CM03043 WITHDRWN 05/22/2006 N/A COMBO DEMOLITION:POOL & PART OF SHOWER & PUMP ROOM BLDG
T07OT00620 FINAL 03/19/2007 11/12/2007 SIGN 12802
T10CM00865 FINAL 04/01/2010 03/09/2011 COMBO SOLAR ELECTRIC SYSTEM
T10OT01272 FINAL 06/10/2010 03/07/2011 SIGN 18489
T11EL01951 FINAL 07/21/2011 01/18/2012 ELECT REPLACE ELECTRICAL WIRE FROM PANEL TO BOOSTER PUMP
T15CM00245 FINAL 01/14/2015 12/23/2015 COMBO PARK IMPROVEMENTS
T15CM02197 FINAL 04/06/2015 12/21/2015 COMBO ADD DRINKING FOUNTAIN TO CITY PARK
T15EX00414 FINAL 03/26/2015 05/25/2015 EXCAV ASPHALT EXISTING GRAVEL PARKING LOTS AND INSTALL NEW SIDEWALK INPARK AREA, NEW SITE FURNISHINGS.
T15OT00056 FINAL 01/14/2015 N/A FLOODPLN FUP - DP15-0004: VUA improvements
T15TC00790 FINAL 03/26/2015 N/A BARRICAD ASPHALT EXISTING GRAVEL PARKING LOTS AND INSTALL NEW SIDEWALK INPARK AREA, NEW SITE FURNISHINGS.
T17FO00839 FINAL 10/04/2017 05/02/2018 FIREOPER HT - PLACES OF ASSEMBLY - ANNUAL FIRE INSPECTION
T18FO00764 FINAL 09/17/2018 06/12/2019 FIREOPER GENERAL INSPECTION
T18RW05450 FINAL 12/10/2018 01/10/2019 ROW EMERGENCY INTERSECTION WEST BOUND LANE / E 36TH ST ST / S FORGEUS AV REPAIR LEAKING MAIN
T19RW00396 FINAL 01/25/2019 03/01/2019 ROW 7 LF AT THE SOUTH SIDE OF THE ADDRESS FOR CONTRACTOR TO COMPLETE PERM PATCH XREF EXPIRED PERMIT T18RW05450 01/10/2019
T20RW01747 FINAL 03/19/2020 02/13/2021 ROW TEP to replace approx. 5,000' of overhead primary cable, remove/install/replace and maintenance 39 utility poles, 19 anchors and 2 junction cabinets. ****PERMIT FOR WORK WITHIN COT ROW ONLY**** NOTES: Road was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.
T20RW04772 FINAL 08/25/2020 10/21/2020 ROW ASPHALT REMOVAL AND CONSTRUCTION OF 5,500 SF (120 LF) TRAFFIC TRIANGLE WITH GRADING FOR STORMWATER HARVESTING, TREES AND SHRUBS FOR PUEBLO GARDENS TRAFFIC TRIANGLE.
T21RW01469 FINAL 03/30/2021 07/31/2021 ROW PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Part 1: From TEP Pole on SE corner of 2585 E 36th st, place 3x3' pot hole and place new riser on new pole. Tie in. Place 3x3' pot hole to transfer anchor to new pole. Transfer aerial coax, heading E 30' to new pole. Tie in. Part 2: From TEP Pole E of 2554 E 36th St, Place 3x3' pot hole and transfer riser to new pole. Tie in. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS
T21RW01470 FINAL 03/30/2021 06/13/2021 ROW PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. starting on the N/E corner of E. 36th st and S. Forgeus Ave at TEP pole remove existing abandoned Coax and fiber going West 120' to New tep pole. from NEW TEP pole on the N/W corner of E. 36th st and S. Forgeus Ave place new riser and riser down pole, hand trench North 10' from base of pole continue North 157' trench / bore then West 15' to out of row OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. ALL OPEN TRENCHES SHALL BE PLATED OVERNIGHT.