Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2024 | COT - HCPL - Rough Soil | Partial Pass | All underground approved. Okay to backfill shading required. Pending grease interceptor and new location for floor drain. 8/23/2024 | |
| COT - HCPL - Rough Soil | Partial Pass | All underground approved. Okay to backfill shading required. Pending grease interceptor and new location for floor drain. 8/23/2024 9/9/24: new location for floor drain passed ok to proceed. Pending grease interceptor. |
||
| 09/10/2024 | COT - HCPL - Rough Soil | Partial Pass | 9/10/2024 inspection is for pouring back saw cuts for underground plumbing. dowels every 32 on center staggered plumbing wrapped. Okay for concrete placement. | |
| 09/19/2024 | COT - HCPL - Rough Soil | Passed | Grease interceptor with 2” - 4” waste lines at North side of structure. Ok to cover progress areas |