Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/06/2023
Applicant:
Description:
THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.

Permit Reviews

Permit Number - TC-COM-0423-00982
Permit Status: Complete
Permit Description: THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.
Start Date Submittal Complete Date Status  
06/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/14/2024 REQUIRES RESUBMIT Review Details
06/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/25/2024 APPROVED Review Details
07/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/23/2024 APPROVED Review Details
07/14/2023 COMMERCIAL REVIEW - FULL v.2 07/21/2023 REQUIRES RESUBMIT Review Details
08/11/2023 RESTAMP - COMMERCIAL v.1 08/15/2023 APPROVED Review Details
04/10/2023 COMMERCIAL REVIEW - FULL v.1 05/09/2023 REQUIRES RESUBMIT Review Details
07/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/17/2024 REQUIRES RESUBMIT Review Details
08/07/2023 COMMERCIAL REVIEW - FULL v.3 08/11/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0423-00982
Permit Status: Complete
Permit Description: THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.
Date Description Comments
06/10/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/10/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/10/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/10/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
06/25/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
06/25/2024 Masonry Inspection Report submittal review is required.
06/25/2024 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
06/25/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/14/2024 STATE FIRE MARSHAL INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0423-00982
Permite Description: THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
02/28/2024 COT - HCBU - Framing N/A Partial Pass
06/05/2024 COT - HCME - Mechanical Progress N/A Partial Pass 6/5/24: kitchen grease hood smoke test passed at first floor. Ok to wrap progress areas.
05/30/2024 COT - HCBU - Building Progress N/A Not Ready
COT - FCON - Fire - Final N/A Not Ready
06/21/2024 COT - HCEL - Electrical Final N/A Partial Pass 6/21/2024 partial pass. Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152
06/21/2024 COT - HCEL - Outdoor Lighting N/A Partial Pass 6/21/2024 partial pass. Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152
06/21/2024 COT - HCME - Mechanical Final N/A Partial Pass 6/21/2024 partial pass. Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152
06/21/2024 COT - HCPL - Plumbing Final N/A Partial Pass 6/21/2024 partial pass. Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152
07/12/2024 ENGR Engineering Final N/A Not Ready The contract is still working on this site at various locations and one need to have all work completed prior to scheduling this inspection since this inspection is for a Temporary Certificate of Occupancy for the school.

Also, the retention detention basin on the site is holding water past the 12 hour maximum limit, and will need to be checked by the engineer of record. I have advised BFL do you have the engineer of record look at the site and come up with a solution that will help eliminate all of the water within the 12 hour maximum limit.
06/21/2024 COT - HCBU - Building Final N/A Partial Pass 6/21/2024 partial pass. Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0423-00982
Permit Description: THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.
Total Completed Inspections - 31
Date Description Inspector Results Comments
03/05/2024 COT - HCPL - Gas Pressure Test Passed
05/03/2024 BULD - Electrical Clearance Passed 3300 s Park Ave Unit 2 ECO TEP CLEARANCE
05/03/2024 COT - HCBU - Preslab Passed
05/03/2024 COT - HCEL - Electrical Underground Passed
05/03/2024 COT - HCBU - Roof Nailing Passed
05/03/2024 COT - HCME - Mechanical Intermediate Passed
05/03/2024 COT - HCBU - Exterior Clips/Sheathing Passed
05/03/2024 COT - HCEL - Electrical Intermediate Passed
05/15/2024 COT - HCBU - Framing Passed
05/15/2024 COT - HCPL - Plumbing Intermediate Passed
05/22/2024 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
05/22/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
06/21/2024 COT - HCPL - Plumbing Above Ceiling Passed Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152
06/21/2024 COT - HCBU - Building Above Ceiling Passed Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152
06/21/2024 COT - HCME - Mechanical Above Ceiling Passed
06/21/2024 COT - HCEL - Electrical Above Ceiling Passed Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152
06/26/2024 COT - BULD - SWG Clearance Passed 6/26/24: SWG Clearance for meter tag
06/26/2024 COT - HCPL - Gas Final Passed
06/26/2024 COT - HCPL - Plumbing Progress Passed
06/26/2024 COT - HCEL - Electrical Progress Passed
06/26/2024 COT - HCME - Mechanical Progress Passed
06/26/2024 COT - HCBU - Building Progress Passed
07/01/2024 COT - FCON - Fire - Final Passed
07/11/2024 TRSP - ROW - Final/Close-Out Passed
07/11/2024 COT - HCEL - Electrical Final Passed
07/11/2024 COT - HCEL - Outdoor Lighting Passed
07/11/2024 COT - HCME - Mechanical Final Passed
07/11/2024 COT - HCPL - Plumbing Final Passed
07/19/2024 ENGR Engineering Final Passed
07/19/2024 COT - HCBU - Building Final Passed 6/7/24: progress inspection on offices first floor north east for finals. ADA requirements not met at bathrooms.
6/10/24: progress inspection on offices first floor south west for finals. ADA requirements not met at bathrooms
6/11/24: Restrooms at first floor passed. Pending ADA approved restroom signs at Final
6/14/24: 127(penetrations at 2nd floor decking need to be sealed, receptacle not functioning) ,128(missing hanger at water line and missing cover for shut-off valve)


6/21/2024 partial pass. Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152
6/26/24: OK FOR TCO LEVEL 1
6/25/24: will be called in with T.I final. Pending fire for engineering final for shell permit.
7/11/24: Ok for LEVEL 4 TCO
7/19/24: ok For CofO
07/19/2024 COT - HCBU - CofO Passed 6/7/24: progress inspection on offices first floor north east for finals. ADA requirements not met at bathrooms.
6/10/24: progress inspection on offices first floor south west for finals. ADA requirements not met at bathrooms
6/11/24: Restrooms at first floor passed. Pending ADA approved restroom signs at Final
6/14/24: 127(penetrations at 2nd floor decking need to be sealed, receptacle not functioning) ,128(missing hanger at water line and missing cover for shut-off valve)


6/21/2024 partial pass. Room number corridor 100 north and south. 101, 150, 151, 152, 156, 146, 147, 145 and 135, 124, 124B, 126A, 125, 130, AND 131.
SECOND FLOOR. 203, 204, 207, 210, 211, 237, 236, 235, 234, 223, 232, 233, 231, 225, 219, 218, 217, 212, 213, 214, 214A, 215, 220A, 218A, 220, 222, 221, 225, Corridor 200 main, Middle East, west.
Level 1 TCO FOR ROOM #152
6/26/24: OK FOR TCO LEVEL 1
6/25/24: will be called in with T.I final. Pending fire for engineering final for shell permit.
7/11/24: Ok for LEVEL 4 TCO
7/19/24: ok For CofO

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
JTED - TEST - BALANCE REPORTS- REV 2_V2.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
SPECIAL INSPECTIONS 2-2024-06-24_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTIONS 3-2024-06-24_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTIONS-2024-06-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-JTED-II_TI-PACKAGE-DRAWINGS_V2_V2.PDF DOCUMENTS VIEW
CONS-JTED-II_TI-PACKAGE_DRAWINGS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-JTED-II_TI-PACKAGE-DRAWINGS_V2_V2.PDF DOCUMENTS VIEW
CONS-JTED-II_TI-PACKAGE_DRAWINGS_V1.PDF DOCUMENTS VIEW
JTED_GEOTECH-REPORT_REFERENCE_V1.PDF DOCUMENTS VIEW
JTED-II_TI_MECH-COM-CHECK_V1.PDF DOCUMENTS VIEW
JTED-II_TI_MECH-SYSTEMS-DESIGN-REPORT_V1.PDF DOCUMENTS VIEW
JTED-II_TI_STRUCTURAL-CALCULATIONS_V1.PDF DOCUMENTS VIEW
CONS-CONS-JTED-II_TI-PACKAGE-DRAWINGS_V2_V2.PDF DOCUMENTS VIEW
CONS-JTED-II_TI-PACKAGE_DRAWINGS_V1.PDF DOCUMENTS VIEW
JTED-II_TI_STRUCTURAL-CALCULATIONS_V1.PDF DOCUMENTS VIEW
JTED-II_TI_MECH-COM-CHECK_V1.PDF DOCUMENTS VIEW
JTED-II_TI_MECH-SYSTEMS-DESIGN-REPORT_V1.PDF DOCUMENTS VIEW