Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1681 W VALENCIA RD
Apply Date:
03/18/2025
Applicant:
Anthony Capps
Description:
Burger King addition and remodel

Permit Reviews

Permit Number - TC-COM-0325-00519
Permit Status: Complete
Permit Description: Burger King addition and remodel
Start Date Submittal Complete Date Status  
07/02/2025 RESTAMP - COMMERCIAL v.1 07/15/2025 APPROVED Review Details
01/02/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/05/2026 REQUIRES RESUBMIT Review Details
12/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/22/2025 APPROVED Review Details
12/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/30/2025 APPROVED Review Details
03/20/2025 COMMERCIAL REVIEW - FULL v.1 04/15/2025 REQUIRES RESUBMIT Review Details
10/29/2025 COMMERCIAL REVIEW - FULL REVISION v.1 10/31/2025 APPROVED Review Details
02/02/2026 ADMINISTRATIVE v.2 02/02/2026 APPROVED Review Details
04/24/2025 COMMERCIAL REVIEW - FULL v.2 05/19/2025 REQUIRES RESUBMIT Review Details
06/23/2025 COMMERCIAL REVIEW - FULL v.4 07/01/2025 REQUIRES RESUBMIT Review Details
02/02/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/02/2026 REQUIRES RESUBMIT Review Details
09/24/2025 COMMERCIAL REVIEW - FULL REVISION v.3 10/20/2025 APPROVED Review Details
07/02/2025 COMMERCIAL REVIEW - FULL v.5 07/02/2025 APPROVED Review Details
05/19/2025 COMMERCIAL REVIEW - FULL v.3 06/18/2025 REQUIRES RESUBMIT Review Details
08/26/2025 COMMERCIAL REVIEW - FULL REVISION v.1 09/19/2025 REQUIRES RESUBMIT Review Details
01/08/2026 ADMINISTRATIVE v.1 01/08/2026 REQUIRES RESUBMIT Review Details
01/06/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/08/2026 APPROVED Review Details
02/03/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/09/2026 APPROVED Review Details
09/22/2025 COMMERCIAL REVIEW - FULL REVISION v.2 09/22/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0325-00519
Permit Status: Complete
Permit Description: Burger King addition and remodel
Date Description Comments
05/22/2025 AIR BALANCING REPORT IS REQUIRED.
10/21/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/22/2025 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
07/16/2025 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
05/22/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/22/2025 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
05/22/2025 Post-Installed Anchor Inspection Report is required.
03/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/02/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
05/22/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00519
Permite Description: Burger King addition and remodel
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/08/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass 10/8/25: electrical at kitchen area approved at risk that revision gets submitted prior to final and approved. Pending panels and bathrooms.
12/23/2025 COT - HCEL - Electrical Final N/A Not Ready
12/23/2025 COT - HCME - Mechanical Final N/A Not Ready
12/23/2025 COT - HCPL - Plumbing Final N/A Not Ready
12/23/2025 COT - HCBU - Building Final N/A Not Ready
12/30/2025 COT - FCON - Fire - Final N/A Partial Pass Ok for Level 4 TCO. Need to get existing Kitchen Hood Duct work cleaned of grease build up.
12/30/2025 COT - HCEL - Outdoor Lighting N/A Partial Pass 12-30-25: complete wall cladding/facade around business sign located on north side of building.
OKAY FOR LEVEL 4 TCO PENDING R OF WAY, FIRE INSPECTION, TOGETHER WITH OUTDOOR LIGHTING APPROVAL.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00519
Permit Description: Burger King addition and remodel
Total Completed Inspections - 23
Date Description Inspector Results Comments
08/25/2025 BULD - Electrical Clearance Passed 8-25-25: okay to re-energize meter 154496580. RECN clearance issued to TEP.
09/12/2025 COT - HCBU - Roof Nailing Passed
12/23/2025 COT - HCPL - Rough Soil Passed
12/23/2025 COT - HCPL - Plumbing Intermediate Passed
12/23/2025 COT - HCPL - Plumbing Above Ceiling Passed
12/23/2025 COT - HCME - Mechanical Intermediate Passed
12/23/2025 COT - HCME - Mechanical Above Ceiling Passed
12/23/2025 COT - HCEL - Electrical Underground Passed
12/23/2025 COT - HCEL - Electrical Intermediate Passed
12/23/2025 COT - HCEL - Electrical Above Ceiling Passed
12/23/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
12/23/2025 COT - HCBU - Preslab Passed
12/23/2025 COT - HCBU - Framing Passed
12/23/2025 COT - HCBU - Exterior Clips/Sheathing Passed
12/23/2025 COT - HCBU - Building Above Ceiling Passed
12/30/2025 COT - HCEL - Electrical Final Passed 12-30-25: electrical final approved.
12/30/2025 COT - HCME - Mechanical Final Passed 12-30-25: mechanical final approved.
12/30/2025 COT - HCPL - Plumbing Final Passed 12-30-25: plumbing final approved.
01/05/2026 TRSP - ROW - Final/Close-Out Passed
12/30/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
02/13/2026 COT - HCBU - Building Final Passed 2-13-26: wall cladding around business sign approved.
02/19/2026 COT - FCON - Fire - Final Passed
02/19/2026 COT - HCEL - Outdoor Lighting Passed 2-19-26: outdoor lighting approved.