Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0325-00519
Permit Details
Status:
In Review
Type:
Commercial Building
Address:
1681 W VALENCIA RD
Address NEW:
1681 W VALENCIA RD
Apply Date:
03/18/2025
Applicant:
Anthony Capps
Description:
Burger King addition and remodel
Permit Reviews
Permit Number - TC-COM-0325-00519
Permit Status: In review
Permit Description: Burger King addition and remodel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2025 | RESTAMP - COMMERCIAL v.1 | 07/15/2025 | APPROVED |
| 01/02/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/05/2026 | REQUIRES RESUBMIT |
| 12/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/22/2025 | APPROVED |
| 12/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/30/2025 | APPROVED |
| 03/20/2025 | COMMERCIAL REVIEW - FULL v.1 | 04/15/2025 | REQUIRES RESUBMIT |
| 10/29/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 10/31/2025 | APPROVED |
| 02/02/2026 | ADMINISTRATIVE v.2 | 02/02/2026 | APPROVED |
| 04/24/2025 | COMMERCIAL REVIEW - FULL v.2 | 05/19/2025 | REQUIRES RESUBMIT |
| 06/23/2025 | COMMERCIAL REVIEW - FULL v.4 | 07/01/2025 | REQUIRES RESUBMIT |
| 02/02/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/02/2026 | REQUIRES RESUBMIT |
| 09/24/2025 | COMMERCIAL REVIEW - FULL REVISION v.3 | 10/20/2025 | APPROVED |
| 07/02/2025 | COMMERCIAL REVIEW - FULL v.5 | 07/02/2025 | APPROVED |
| 05/19/2025 | COMMERCIAL REVIEW - FULL v.3 | 06/18/2025 | REQUIRES RESUBMIT |
| 08/26/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 09/19/2025 | REQUIRES RESUBMIT |
| 01/08/2026 | ADMINISTRATIVE v.1 | 01/08/2026 | REQUIRES RESUBMIT |
| 01/06/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/08/2026 | APPROVED |
| 02/03/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | N/A | IN REVIEW |
| 09/22/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 09/22/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0325-00519
Permit Status: In review
Permit Description: Burger King addition and remodel
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/22/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0325-00519
Permit Status: In review
Permit Description: Burger King addition and remodel
| Date | Description | Comments |
|---|---|---|
| 05/22/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 10/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/22/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 07/16/2025 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 05/22/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/22/2025 | Post-Installed Anchor Inspection Report is required. | |
| 03/20/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/02/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 05/22/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-COM-0325-00519
Permite Description: Burger King addition and remodel
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 10/8/25: electrical at kitchen area approved at risk that revision gets submitted prior to final and approved. Pending panels and bathrooms. |
| 12/23/2025 | COT - HCEL - Electrical Final | N/A | Not Ready | |
| 12/30/2025 | COT - HCEL - Outdoor Lighting | N/A | Partial Pass | 12-30-25: complete wall cladding/facade around business sign located on north side of building. OKAY FOR LEVEL 4 TCO PENDING R OF WAY, FIRE INSPECTION, TOGETHER WITH OUTDOOR LIGHTING APPROVAL. |
| 12/23/2025 | COT - HCME - Mechanical Final | N/A | Not Ready | |
| 12/23/2025 | COT - HCPL - Plumbing Final | N/A | Not Ready | |
| 12/30/2025 | COT - FCON - Fire - Final | N/A | Partial Pass | Ok for Level 4 TCO. Need to get existing Kitchen Hood Duct work cleaned of grease build up. |
| 12/23/2025 | COT - HCBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-0325-00519
Permit Description: Burger King addition and remodel
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2025 | BULD - Electrical Clearance | Passed | 8-25-25: okay to re-energize meter 154496580. RECN clearance issued to TEP. | |
| 09/12/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 12/23/2025 | COT - HCPL - Rough Soil | Passed | ||
| 12/23/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 12/23/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 12/23/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 12/23/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 12/23/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 12/23/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 12/23/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 12/23/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 12/23/2025 | COT - HCBU - Preslab | Passed | ||
| 12/23/2025 | COT - HCBU - Framing | Passed | ||
| 12/23/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 12/23/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 12/30/2025 | COT - HCEL - Electrical Final | Passed | 12-30-25: electrical final approved. | |
| 12/30/2025 | COT - HCME - Mechanical Final | Passed | 12-30-25: mechanical final approved. | |
| 12/30/2025 | COT - HCPL - Plumbing Final | Passed | 12-30-25: plumbing final approved. | |
| 01/05/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 12/30/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |