Permit: TC-COM-0325-00419
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
1532 S PERLMAN AV
Address NEW:
1532 S PERLMAN AV
Apply Date:
03/04/2025
Applicant:
Alvaro Brassea
Description:
NEW 1,360 SF EXPANSION TO THE BACK OF THE EXIST RES. CHANGING OCCUPANCY FROM 5 TO 10 BED ADULT CARE HOME. (REV 3: Header Detail at HALL)
Permit Reviews
Permit Number - TC-COM-0325-00419
Permit Status: Needs resubmittal
Permit Description: NEW 1,360 SF EXPANSION TO THE BACK OF THE EXIST RES. CHANGING OCCUPANCY FROM 5 TO 10 BED ADULT CARE HOME. (REV 3: Header Detail at HALL)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/12/2025 | COMMERCIAL REVIEW - FULL v.3 | 06/24/2025 | APPROVED |
| 05/06/2025 | COMMERCIAL REVIEW - FULL v.2 | 06/03/2025 | REQUIRES RESUBMIT |
| 03/05/2025 | COMMERCIAL REVIEW - FULL v.1 | 04/01/2025 | REQUIRES RESUBMIT |
| 06/10/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/10/2026 | REQUIRES RESUBMIT |
| 11/12/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 12/05/2025 | APPROVED |
| 06/24/2025 | RESTAMP - COMMERCIAL v.1 | 06/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0325-00419
Permit Status: Needs resubmittal
Permit Description: NEW 1,360 SF EXPANSION TO THE BACK OF THE EXIST RES. CHANGING OCCUPANCY FROM 5 TO 10 BED ADULT CARE HOME. (REV 3: Header Detail at HALL)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/24/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0325-00419
Permit Status: Needs resubmittal
Permit Description: NEW 1,360 SF EXPANSION TO THE BACK OF THE EXIST RES. CHANGING OCCUPANCY FROM 5 TO 10 BED ADULT CARE HOME. (REV 3: Header Detail at HALL)
| Date | Description | Comments |
|---|---|---|
| 06/24/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 05/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/05/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/24/2025 | Truss Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0325-00419
Permite Description: NEW 1,360 SF EXPANSION TO THE BACK OF THE EXIST RES. CHANGING OCCUPANCY FROM 5 TO 10 BED ADULT CARE HOME. (REV 3: Header Detail at HALL)
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 04/06/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 04/07/2026 | COT - LCEL - Electrical Above Ceiling | N/A | Not Applicable | |
| 04/06/2026 | COT - LCBU - Building Final | N/A | Re-inspection required | 4/6/26 1. Protect pipes under sink with vinyl covers. 2. Grab bars are missing in the ADA bathrooms. 3. Paint all exterior plastics. 4. Weep screed not installed properly there is about a 2" gap between wall and screed; also weep holes are blocked with stucco or debris. |
| 04/06/2026 | COT - LCEL - Electrical Final | N/A | Re-inspection required | |
| 04/06/2026 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 4/6/26 1. Protect pipes under sink with vinyl covers. 2. Grab bars are missing in the ADA bathrooms. 3. Paint all exterior plastics. |
| 04/08/2026 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Not Applicable |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0325-00419
Permit Description: NEW 1,360 SF EXPANSION TO THE BACK OF THE EXIST RES. CHANGING OCCUPANCY FROM 5 TO 10 BED ADULT CARE HOME. (REV 3: Header Detail at HALL)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2025 | COT - LCPL - Rough Soil | Passed | Okay to backfill. Shading required. 9/24/2024 | |
| 10/08/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 10/09/2025 | COT - LCBU - Preslab | Passed | ||
| 11/03/2025 | COT - LCBU - Roof Nailing | Passed | ||
| 12/09/2025 | COT - LCBU - Framing | Passed | Passed 12/9/25 | |
| 12/09/2025 | COT - LCPL - Plumbing Intermediate | Passed | Passed 12/9/25 | |
| 12/09/2025 | COT - LCME - Mechanical Intermediate | Passed | Passed 12/9/25 | |
| 12/09/2025 | COT - LCEL - Electrical Intermediate | Passed | Passed 12/9/25 | |
| 04/06/2026 | COT - LCME - Mechanical Final | Passed | ||
| 04/06/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 04/07/2026 | TRSP - ROW - Final/Close-Out | Passed | Work completed with no impact to right of way | |
| 04/06/2026 | COT - FCON - Alarm - Final | Passed | ||
| 04/06/2026 | COT - FCON - Fire - Final | Passed | ||
| 04/07/2026 | COT - LCEL - Grounding/Bonding | Passed | ||
| 04/07/2026 | COT - LCBU - Building Final | Passed | 4/7/26 All corrections completed. |
|
| 04/07/2026 | COT - LCEL - Electrical Final | Passed | ||
| 04/07/2026 | COT - LCPL - Plumbing Final | Passed | 4/7/26 All corrections completed. |
|
| 05/06/2026 | COT - FCON - Sprinkler - Final | Passed |