Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0325-00419
Parcel: 136020220

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0325-00419
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/27/2025 Commercial Building Standard APPROVED
05/27/2025 Commercial Mechanical Standard APPROVED
06/02/2025 Site Zoning Standard APPROVED
05/27/2025 Water - PDSD Standard APPROVED
06/02/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/27/2025 Commercial Plumbing Standard REQUIRES RESUBMIT 1. To convert the water fixture units to water demand (GPM) see Table E103.3(3), IPC 2018 (e.g. 45 water fixture units gives a demand of 27.7 GPM). [Initial comment: Correct the Pressure Loss Calculation to include the pressure drop caused by a reduced pressure principle backflow assembly and to correctly calculate the pressure loss due to static lift (0.433 PSI per foot of lift).]
2. Revise the water heater detail to show the recirculation pump, shut-off valves and check valve connecting to the cold water inlet. Also, show the expansion tank connecting to the cold water inlet to the water heater. Reference: Section 303.2, IPC 2018 and Section 107.2.1, IBC 2018. [Initial comment: Revise the water heater detail to include a shut off valve for the cold water inlet and thermal expansion control (e.g., an expansion tank). (Note: the unit has a hot water outlet, not a hot water inlet). Reference: Sections 606.1 and 607.3, IPC 2018.]
3. Comment not addressed. Provide cleanouts for all horizontal drains in the building; the cleanouts shall be sized per Section 708.1.7, IPC 2018 and shall open to allow cleaning in the direction of flow. Reference: Sections 708.1.1 and 708.1.8, IPC 2018. [Initial comment: Show the locations of the cleanouts for the sanitary drain system. Reference: Section 708.1.1, IPC 2018.]
05/06/2025 PDSD Application Completeness Express REVIEW COMPLETED