Permit: TC-COM-0323-00800
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2445 N ORACLE RD BLDG 9
Address NEW:
2445 N ORACLE RD BLDG 9
Apply Date:
03/13/2023
Applicant:
City of Tucson
Description:
NEW MULTI-FAMILY DEVELOPMENT, BLDG 9, 48,753 SF, 48 UNITS AND INCLUDES DEMO - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING" PERMITS. BLDGS 1,2,4-8 & 10 ARE "COMMERCIAL ADDITION/ALTERATION" PERMITS".
Permit Reviews
Permit Number - TC-COM-0323-00800
Permit Status: Complete
Permit Description: NEW MULTI-FAMILY DEVELOPMENT, BLDG 9, 48,753 SF, 48 UNITS AND INCLUDES DEMO - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING" PERMITS. BLDGS 1,2,4-8 & 10 ARE "COMMERCIAL ADDITION/ALTERATION" PERMITS".
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/13/2023 | COMMERCIAL REVIEW - FULL v.1 | 04/11/2023 | REQUIRES RESUBMIT |
| 06/12/2023 | COMMERCIAL REVIEW - FULL v.4 | 06/16/2023 | REQUIRES RESUBMIT |
| 04/24/2023 | COMMERCIAL REVIEW - FULL v.3 | 05/26/2023 | REQUIRES RESUBMIT |
| 06/27/2023 | RESTAMP - COMMERCIAL v.1 | 07/03/2023 | APPROVED |
| 12/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/17/2024 | APPROVED |
| 06/27/2023 | COMMERCIAL REVIEW - FULL v.5 | 06/27/2023 | APPROVED |
| 03/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/28/2025 | APPROVED |
| 04/11/2023 | COMMERCIAL REVIEW - FULL v.2 | 04/11/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0323-00800
Permit Status: Complete
Permit Description: NEW MULTI-FAMILY DEVELOPMENT, BLDG 9, 48,753 SF, 48 UNITS AND INCLUDES DEMO - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING" PERMITS. BLDGS 1,2,4-8 & 10 ARE "COMMERCIAL ADDITION/ALTERATION" PERMITS".
| Date | Description | Comments |
|---|---|---|
| 12/23/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 12/23/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 12/23/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 12/23/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 03/28/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/26/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 03/27/2025 | ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 12/23/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 12/23/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 12/23/2024 | This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit. | |
| 03/28/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
| 06/16/2023 | SPECIAL INSPECTION FOR Prefabricated Wood Elements IS REQUIRED | |
| 03/28/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 03/28/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/23/2024 | Verify that Permit #P23SD00041 - Milagro on Oracle - Public Sewer is issued and all fees are paid – Waste water receipt | |
| 03/28/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 06/16/2023 | SPECIAL INSPECTION FOR Structural Steel IS REQUIRED | |
| 03/27/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 06/16/2023 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 03/28/2025 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. | |
| 12/23/2024 | Prior to project being finalized applicant must provide new water easement recordation information |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00800
Permite Description: NEW MULTI-FAMILY DEVELOPMENT, BLDG 9, 48,753 SF, 48 UNITS AND INCLUDES DEMO - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING" PERMITS. BLDGS 1,2,4-8 & 10 ARE "COMMERCIAL ADDITION/ALTERATION" PERMITS".
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2023 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | Elevator shaft. Elevator walls 2nd lift at 16'. Okay to grout per special inspection report. 11/16/2023 11/17/23: Elevator shaft, elevator walls 3rd lift at 24'. Okay to grout per special inspection report. 11/28/23: Elevator shaft, elevator walls 4th lift at 32'. Okay to grout per special inspection report. |
| 11/16/2023 | COT - HCEL - Grounding/Bonding | N/A | Not Ready | |
| 04/11/2024 | COT - HCBU - Framing | N/A | Partial Pass | Level #1, room units and,common areas. |
| 01/17/2025 | COT - HCEL - Electrical Final | N/A | Not Ready | |
| 01/17/2025 | COT - LCME - Mechanical Final | N/A | Not Ready | |
| 01/17/2025 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
| 01/17/2025 | ENGR Engineering Final | N/A | Partial Pass | Okay for level 4 TCO |
| 01/17/2025 | COT - LCBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00800
Permit Description: NEW MULTI-FAMILY DEVELOPMENT, BLDG 9, 48,753 SF, 48 UNITS AND INCLUDES DEMO - BLDGS 3 & 9 ARE "COMMERCIAL NEW BUILDING" PERMITS. BLDGS 1,2,4-8 & 10 ARE "COMMERCIAL ADDITION/ALTERATION" PERMITS".
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/11/2024 | COT - LCBU - Preslab | Passed | Ok to place concrete when vapor barrier is in place. | |
| 04/26/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 04/26/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 04/26/2024 | COT - HCBU - Masonry Pregrout | Passed | ||
| 04/26/2024 | COT - HCEL - Grounding/Bonding | Passed | ||
| 05/02/2024 | COT - BULD - SWG Clearance | Passed | ||
| 05/21/2024 | COT - HCBU - Framing | Passed | ||
| 07/25/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 07/25/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 07/25/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 07/25/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
| 07/25/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 07/25/2024 | COT - HCEL - Electrical Progress | Passed | ||
| 09/11/2024 | COT - HCEL - Electrical Underground | Passed | 9/11/24: buildings 3,9,10 secondary conduit coming from transformer | |
| 11/12/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. BUILDING #9. (Distribution A) Generator, Elevator, Lighting, 9408,9401,9402,9403,9404,9405,9406,9413,9411,9412,9410,9409. (Distribution B) 9407,9313,9312,9311,9310,9309,9308,9307,9306,9305,9304,9303. (Distribution C) 9301,9211,9210,9209,9208,9207,9206,9205,9204,9203,9202,9302. (Distribution D) 9201,9118,9117,9116,9115,9114,9112,9113,9111,9110,9109,9108. 11/12/2024 |
|
| 12/17/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
| 01/22/2025 | COT - FCON - Alarm - Final | Passed | ||
| 01/22/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 01/22/2025 | COT - HCEL - Electrical Final | Passed | ||
| 01/22/2025 | COT - FCON - Fire - Final | Passed | ||
| 01/22/2025 | COT - LCME - Mechanical Final | Passed | ||
| 01/22/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 01/22/2025 | ENGR Engineering Final | Passed | ||
| 01/22/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 02/25/2025 | COT - LCBU - Building Final | Passed | ok for CO |