Permit: TC-COM-0226-00239
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
3313 E SPEEDWAY BL
Address NEW:
3313 E SPEEDWAY BL
Apply Date:
02/18/2026
Applicant:
Dennis Caldwell
Description:
Rev.1: 6/22/2026 (REV #3: NEW COLUMNS & BEAMS) ENTERPRISE - T.I. on existing commercial building. Building remains as is with no additional square footage added. all site conditions are to remain. work will include: architectural, electrical, and mechanical.
Permit Reviews
Permit Number - TC-COM-0226-00239
Permit Status: Issued
Permit Description: Rev.1: 6/22/2026 (REV #3: NEW COLUMNS & BEAMS)
ENTERPRISE - T.I. on existing commercial building. Building remains as is with no additional square footage added. all site conditions are to remain. work will include: architectural, electrical, and mechanical.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2026 | COMMERCIAL REVIEW - FULL v.3 | 04/14/2026 | REQUIRES RESUBMIT |
| 03/20/2026 | COMMERCIAL REVIEW - FULL v.2 | 03/20/2026 | REQUIRES RESUBMIT |
| 07/14/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 07/14/2026 | APPROVED |
| 04/17/2026 | COMMERCIAL REVIEW - FULL v.4 | 04/22/2026 | APPROVED |
| 08/06/2026 | SPECIAL INSPECTION REVIEW v.1 | 08/10/2026 | APPROVED |
| 06/22/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 07/14/2026 | REQUIRES RESUBMIT |
| 07/17/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/20/2026 | APPROVED |
| 02/23/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/17/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0226-00239
Permit Status: Issued
Permit Description: Rev.1: 6/22/2026 (REV #3: NEW COLUMNS & BEAMS)
ENTERPRISE - T.I. on existing commercial building. Building remains as is with no additional square footage added. all site conditions are to remain. work will include: architectural, electrical, and mechanical.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/16/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 07/17/2026 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 07/17/2026 | Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-COM-0226-00239
Permit Status: Issued
Permit Description: Rev.1: 6/22/2026 (REV #3: NEW COLUMNS & BEAMS)
ENTERPRISE - T.I. on existing commercial building. Building remains as is with no additional square footage added. all site conditions are to remain. work will include: architectural, electrical, and mechanical.
| Date | Description | Comments |
|---|---|---|
| 07/12/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 02/23/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/23/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/12/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 07/12/2026 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0226-00239
Permite Description: Rev.1: 6/22/2026 (REV #3: NEW COLUMNS & BEAMS)
ENTERPRISE - T.I. on existing commercial building. Building remains as is with no additional square footage added. all site conditions are to remain. work will include: architectural, electrical, and mechanical.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2026 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
| 07/23/2026 | COT - LCBU - Framing | N/A | Partial Pass | |
| 07/08/2026 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | |
| 07/08/2026 | COT - HCME - Mechanical Above Ceiling | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0226-00239
Permit Description: Rev.1: 6/22/2026 (REV #3: NEW COLUMNS & BEAMS)
ENTERPRISE - T.I. on existing commercial building. Building remains as is with no additional square footage added. all site conditions are to remain. work will include: architectural, electrical, and mechanical.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2026 | PDSD Building Division Pre-Construction Meeting | Passed | ||
| 07/22/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | inspection call for structural revision to accommodate the support beam in the open conference room OK to place concrete in footer |