Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCPL - Plumbing FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2026 | COT - LCPL - Plumbing FinalĀ | Re-inspection required | AIR BALANCING REPORT IS REQUIRED. SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. Post-Installed Anchor Inspection Report is required. |