Inspection Status: Not Ready
Inspection History: COT - LCEL - Electrical Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 07/08/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Not Ready |
|
| 07/16/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Not Ready |
Secure mc cable coming out of j boxes. Provide hangers for low voltage wires throughout. Provide two seismic wires at opposite ends for lighting throughout. Ensure j boxes are not to be buried behind drywall. 7/16/2026 |
| 07/20/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Partial Pass |
|
| 08/03/2026 |
COT - LCEL - Electrical Above Ceiling |
|
Partial Pass |
8/3/2026 partial pass. Conference room approved. |