NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.

Permit Reviews

Permit Number - TC-COM-0223-00619
Permit Status: Complete
Permit Description: NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Start Date Submittal Complete Date Status  
02/14/2023 COMMERCIAL REVIEW - FULL v.1 03/20/2023 APPROVED Review Details
05/22/2023 RESTAMP - COMMERCIAL v.1 06/06/2023 APPROVED Review Details
05/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/31/2024 APPROVED Review Details
05/15/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/22/2023 APPROVED Review Details
06/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/17/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0223-00619
Permit Status: Complete
Permit Description: NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Date Description Comments
03/22/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/20/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
04/04/2023 Prior to Issuance: This project requires issuance of Development Package (DP) TD-DEV-1222-00061 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
03/22/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
07/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/22/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0223-00619
Permite Description: NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
08/08/2023 PDSD Building Division - Site Excavation/Layout/Rebar N/A Not Ready
09/29/2023 COT - HCEL - Electrical Underground N/A Partial Pass 9/29/23 4 light pole bases and A/C Pad 4 ea on west side ok to cover
10/18/2023 COT - HCBU - Preslab N/A Partial Pass 10/18/23 partial approval for 2nd floor first 2 columns from west to east, ok to place concrete
10/11/2023 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 10/11/23: reinforcement per plan in monument signs pg S4.1. North East sign wall reinforcement per plan detail S4.2/4 & 7, south East sign wall reinforcement plan detail S4.2/3,North west sign wall reinforcement per plan detail S4.2/3. Column footings at existing JTED columns reinforcement per plan ok to pour detail S2.2/1 &2
10/11/2023 COT - HCBU - Stem Wall/Retaining Wall N/A Partial Pass 10/11/23: reinforcement per plan in monument signs pg S4.1. North East sign wall reinforcement per plan detail S4.2/4 & 7, south East sign wall reinforcement plan detail S4.2/3,North west sign wall reinforcement per plan detail S4.2/3.
01/16/2024 COT - HCBU - Building Progress N/A Not Ready
12/14/2023 COT - HCPL - Rough Soil N/A Partial Pass Under-slab line for second floor.
12/14/23: grease trap bedding inspected passed. Pending connection and testing.
01/17/2024 ENGR Engineering Final N/A Partial Pass Eastside front of building parking lot 43’ of 8” trench drain With 8” clearance on both sides and below drain has been viewed and is ready for concrete pour.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0223-00619
Permit Description: NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Total Completed Inspections - 12
Date Description Inspector Results Comments
08/28/2023 PDSD Building Division - Site Excavation/Layout/Rebar Passed 8/28/23 partial for per slab on middle section, ok to place concrete
10/11/2023 COT - HCEL - Electrical Underground Passed 9/29/23 4 light pole bases and A/C Pad 4 ea on west side ok to cover
10/11/23: 3 Monument signs electrical underground per plan.
10/11/2023 PDSD Building Division - Sign Footing and Excavation Passed 10/11/23: reinforcement per plan in monument signs pg S4.1. North East sign wall reinforcement per plan detail S4.2/4 & 7, south East sign wall reinforcement plan detail S4.2/3,North west sign wall reinforcement per plan detail S4.2/3.
02/12/2024 COT - HCBU - Preslab Passed
06/25/2024 TRSP - ROW - Final/Close-Out Passed
06/25/2024 COT - HCBU - Framing Passed
06/25/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
06/25/2024 COT - HCBU - Stem Wall/Retaining Wall Passed
06/25/2024 COT - HCBU - Building Progress Passed
06/25/2024 COT - HCPL - Rough Soil Passed
06/25/2024 ENGR Engineering Final Passed Building only, No exterior work being completed on this permit.
07/24/2024 COT - HCBU - Building Final Passed 6/25/24: will be called in with T.I final. Pending fire for engineering final for shell permit.
7/11/24: Ok for LEVEL 4 TCO
7/24/24: ok for CofO

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
JTED 2-BRIDGES FINAL-2024-06-10_V1.PDF DOCUMENTS VIEW
JTED II SPECIALS-2024-06-10_V1.PDF DOCUMENTS VIEW
JTED 2-BRIDGES FINAL-2024-05-29_V1.PDF DOCUMENTS VIEW
DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-JTED-II_FOUNDATION-PACKAGE_V1.PDF DOCUMENTS VIEW