Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0223-00619
Permit Details
Apply Date:
02/10/2023
Applicant:
Ashley Loberg
Description:
NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Permit Reviews
Permit Number - TC-COM-0223-00619
Permit Status: Complete
Permit Description: NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING
THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/14/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/20/2023 | APPROVED |
05/22/2023 | RESTAMP - COMMERCIAL v.1 | 06/06/2023 | APPROVED |
05/30/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/31/2024 | APPROVED |
05/15/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/22/2023 | APPROVED |
06/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/17/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0223-00619
Permit Status: Complete
Permit Description: NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING
THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Date | Description | Comments |
---|---|---|
03/22/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
03/22/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/20/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
04/04/2023 | Prior to Issuance: This project requires issuance of Development Package (DP) TD-DEV-1222-00061 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
03/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/22/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
03/22/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
03/22/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
03/22/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
03/22/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
07/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/22/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
03/22/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
03/22/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0223-00619
Permite Description: NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING
THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/08/2023 | PDSD Building Division - Site Excavation/Layout/Rebar | N/A | Not Ready | |
09/29/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 9/29/23 4 light pole bases and A/C Pad 4 ea on west side ok to cover |
10/18/2023 | COT - HCBU - Preslab | N/A | Partial Pass | 10/18/23 partial approval for 2nd floor first 2 columns from west to east, ok to place concrete |
10/11/2023 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 10/11/23: reinforcement per plan in monument signs pg S4.1. North East sign wall reinforcement per plan detail S4.2/4 & 7, south East sign wall reinforcement plan detail S4.2/3,North west sign wall reinforcement per plan detail S4.2/3. Column footings at existing JTED columns reinforcement per plan ok to pour detail S2.2/1 &2 |
10/11/2023 | COT - HCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | 10/11/23: reinforcement per plan in monument signs pg S4.1. North East sign wall reinforcement per plan detail S4.2/4 & 7, south East sign wall reinforcement plan detail S4.2/3,North west sign wall reinforcement per plan detail S4.2/3. |
01/16/2024 | COT - HCBU - Building Progress | N/A | Not Ready | |
12/14/2023 | COT - HCPL - Rough Soil | N/A | Partial Pass | Under-slab line for second floor. 12/14/23: grease trap bedding inspected passed. Pending connection and testing. |
01/17/2024 | ENGR Engineering Final | N/A | Partial Pass | Eastside front of building parking lot 43’ of 8” trench drain With 8” clearance on both sides and below drain has been viewed and is ready for concrete pour. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0223-00619
Permit Description: NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING
THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/28/2023 | PDSD Building Division - Site Excavation/Layout/Rebar | Passed | 8/28/23 partial for per slab on middle section, ok to place concrete | |
10/11/2023 | COT - HCEL - Electrical Underground | Passed | 9/29/23 4 light pole bases and A/C Pad 4 ea on west side ok to cover 10/11/23: 3 Monument signs electrical underground per plan. |
|
10/11/2023 | PDSD Building Division - Sign Footing and Excavation | Passed | 10/11/23: reinforcement per plan in monument signs pg S4.1. North East sign wall reinforcement per plan detail S4.2/4 & 7, south East sign wall reinforcement plan detail S4.2/3,North west sign wall reinforcement per plan detail S4.2/3. | |
02/12/2024 | COT - HCBU - Preslab | Passed | ||
06/25/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
06/25/2024 | COT - HCBU - Framing | Passed | ||
06/25/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
06/25/2024 | COT - HCBU - Stem Wall/Retaining Wall | Passed | ||
06/25/2024 | COT - HCBU - Building Progress | Passed | ||
06/25/2024 | COT - HCPL - Rough Soil | Passed | ||
06/25/2024 | ENGR Engineering Final | Passed | Building only, No exterior work being completed on this permit. | |
07/24/2024 | COT - HCBU - Building Final | Passed | 6/25/24: will be called in with T.I final. Pending fire for engineering final for shell permit. 7/11/24: Ok for LEVEL 4 TCO 7/24/24: ok for CofO |