Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/17/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Eastside front of building parking lot 43’ of 8” trench drain With 8” clearance on both sides and below drain has been viewed and is ready for concrete pour. |
| 06/25/2024 |
ENGR Engineering Final
|
|
Passed |
Building only, No exterior work being completed on this permit. |