Permit Details

Status:
Complete
Type:
Commercial Building
Address:
1050 S PARK AV
Address NEW:
1050 S PARK AV
Apply Date:
01/29/2025
Applicant:
Brandy Burke
Description:
Interior remodeling and expansion of existing building

Permit Reviews

Permit Number - TC-COM-0125-00197
Permit Status: Complete
Permit Description: Interior remodeling and expansion of existing building
Start Date Submittal Complete Date Status  
08/06/2025 RESTAMP - COMMERCIAL v.1 08/11/2025 APPROVED Review Details
01/05/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/05/2026 REQUIRES RESUBMIT Review Details
01/09/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/12/2026 APPROVED Review Details
10/14/2025 RESTAMP - COMMERCIAL v.1 10/16/2025 APPROVED Review Details
02/03/2025 COMMERCIAL REVIEW - FULL v.1 02/26/2025 REQUIRES RESUBMIT Review Details
08/01/2025 COMMERCIAL REVIEW - FULL v.3 08/04/2025 REQUIRES RESUBMIT Review Details
10/10/2025 COMMERCIAL REVIEW - FULL REVISION v.3 10/14/2025 APPROVED Review Details
10/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/21/2025 APPROVED Review Details
02/06/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/09/2026 APPROVED Review Details
09/22/2025 COMMERCIAL REVIEW - FULL REVISION v.2 10/07/2025 REQUIRES RESUBMIT Review Details
05/16/2025 COMMERCIAL REVIEW - FULL v.2 06/20/2025 REQUIRES RESUBMIT Review Details
08/21/2025 COMMERCIAL REVIEW - FULL REVISION v.1 09/17/2025 REQUIRES RESUBMIT Review Details
08/05/2025 COMMERCIAL REVIEW - FULL v.4 08/06/2025 APPROVED Review Details
10/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/29/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0125-00197
Permit Status: Complete
Permit Description: Interior remodeling and expansion of existing building
Date Description Comments
06/09/2025 AIR BALANCING REPORT IS REQUIRED.
02/03/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/25/2025 SPECIAL INSPECTION OF POST_INSTALLED ANCHORS IS REQUIRED.
02/03/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
02/25/2025 SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED.
06/09/2025 WATER STERILIZATION REPORT IS REQUIRED.
02/25/2025 WOOD "I" Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0125-00197
Permite Description: Interior remodeling and expansion of existing building
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
10/16/2025 BULD - Electrical Clearance N/A Not Applicable
10/16/2025 COT - BULD - SWG Clearance N/A Not Applicable
10/16/2025 COT - LCPL - Gas Pressure Test N/A Not Applicable
10/16/2025 COT - LCEL - Electrical Underground N/A Not Applicable
10/16/2025 COT - LCEL - Grounding/Bonding N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0125-00197
Permit Description: Interior remodeling and expansion of existing building
Total Completed Inspections - 20
Date Description Inspector Results Comments
08/29/2025 COT - LCPL - Plumbing Intermediate Passed
08/29/2025 COT - LCEL - Electrical Above Ceiling Passed
08/29/2025 COT - LCBU - Framing Passed
10/16/2025 COT - LCBU - Excavation/Rebar/Zoning Passed
10/16/2025 TRSP - ROW - Final/Close-Out Passed
10/16/2025 COT - LCPL - Rough Soil Passed
10/22/2025 COT - LCBU - Preslab Passed 10-22-25: per S. Carrasco preslab approved. Okay for concrete placement at progress areas.
11/12/2025 COT - LCBU - Roof Nailing Passed
11/19/2025 COT - LCEL - Electrical Intermediate Passed Ok to insulate and sheet rock progress
12/09/2025 COT - HCEL - Electrical Above Ceiling Passed
12/10/2025 COT - LCME - Mechanical Intermediate Passed
01/15/2026 COT - FCON - Fire - Final Passed
01/15/2026 COT - FCON - Alarm - Final Passed
01/15/2026 COT - LCBU - Building Final Passed Ok to make application for Certificate of Occupancy.
01/15/2026 COT - LCEL - Electrical Final Passed
01/15/2026 COT - LCME - Mechanical Final Passed Air balance test results were submitted.
01/15/2026 COT - LCPL - Plumbing Final Passed Chlorination test results have been submitted.
01/15/2026 COT - FCON - Sprinkler - Final Passed
01/15/2026 COT - LCEL - Outdoor Lighting Passed
02/09/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
SISTER JOSE WOMEN'S CENTER ADDITION - REVISED REPORT_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
24262 SYSTEMS DESIGN REPORT_V1.PDF DOCUMENTS VIEW
SISTER JOSE WATER TEST-2025-10-28_V1.PDF DOCUMENTS VIEW
25-017 SUB13.1 REVISED IJOISTS - CALCS 9.8.25_GEI 09-11-25_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV3 VECA-FINALSJWC 100925_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-SJWC COTREV1_V2_V3.PDF DOCUMENTS VIEW