Permit: TC-COM-0124-00151
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
4420 S 6TH AV
Address NEW:
4420 S 6TH AV
Apply Date:
01/23/2024
Applicant:
Jimmy Sanders
Description:
Installation of rooftop solar and a small parking structure 70.33KW DC/ 65.53KW AC 145 modules REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash. REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Permit Reviews
Permit Number - TC-COM-0124-00151
Permit Status: Inspections complete
Permit Description: Installation of rooftop solar and a small parking structure
70.33KW DC/ 65.53KW AC
145 modules
REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash.
REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 03/25/2026 | APPROVED |
| 04/28/2025 | RESTAMP - COMMERCIAL v.1 | 04/29/2025 | APPROVED |
| 03/05/2024 | COMMERCIAL REVIEW - FULL v.2 | 03/05/2024 | REQUIRES RESUBMIT |
| 07/22/2024 | COMMERCIAL REVIEW - FULL v.4 | 08/08/2024 | REQUIRES RESUBMIT |
| 09/11/2025 | COMMERCIAL REVIEW - FULL v.1 | 09/12/2025 | REQUIRES RESUBMIT |
| 04/08/2024 | COMMERCIAL REVIEW - FULL v.3 | 05/09/2024 | REQUIRES RESUBMIT |
| 04/14/2025 | COMMERCIAL REVIEW - FULL v.5 | 04/28/2025 | APPROVED |
| 01/24/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/26/2024 | REQUIRES RESUBMIT |
| 09/12/2025 | COMMERCIAL REVIEW - FULL v.2 | 10/13/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0124-00151
Permit Status: Inspections complete
Permit Description: Installation of rooftop solar and a small parking structure
70.33KW DC/ 65.53KW AC
145 modules
REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash.
REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
| Date | Description | Comments |
|---|---|---|
| 04/29/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00151
Permite Description: Installation of rooftop solar and a small parking structure
70.33KW DC/ 65.53KW AC
145 modules
REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash.
REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2026 | COT - CSOL - Electrical Progress Solar Project | N/A | Not Ready | |
| 02/12/2026 | COT - LCBU - Building Final | N/A | Not Ready | Provide a set of approved drawings prior to next inspection. 2/12/2026 |
| 02/12/2026 | COT - CSOL - Electrical Underground Solar Project | N/A | Not Ready | |
| 02/12/2026 | COT - CSOL - Grounding/Bonding Solar Project | N/A | Not Ready | |
| 02/12/2026 | COT - LCBU - Framing | N/A | Not Ready | Provide a set of approved drawings prior to next inspection. 2/12/2026 |
| 02/12/2026 | COT - CSOL - Electrical Final Solar Project | N/A | Not Ready | Provide a set of approved drawings prior to next inspection. 2/12/2026 |
| 02/12/2026 | BULD - Electrical Clearance | N/A | Not Ready | Provide a set of approved drawings prior to next inspection. 2/12/2026 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00151
Permit Description: Installation of rooftop solar and a small parking structure
70.33KW DC/ 65.53KW AC
145 modules
REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash.
REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 02/11/2026 | ENGR Engineering Final | Passed | ||
| 02/13/2026 | COT - CSOL - Electrical Progress Solar Project | Passed | ||
| 02/13/2026 | COT - LCBU - Building Final | Passed | ||
| 02/13/2026 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 03/26/2026 | COT - CSOL - Electrical Final Solar Project | Passed | 03/26/2026 Approved clearance TEP DGC. Passed 2/13/26, required current approved plans to match listing DG meter panel. |
|
| 03/26/2026 | BULD - Electrical Clearance | Passed | 03/26/2026 Approved clearance TEP DGC. Passed 2/13/26, required current approved plans to match listing DG meter panel. |