Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address:
4420 S 6TH AV
Address NEW:
4420 S 6TH AV
Apply Date:
01/23/2024
Applicant:
Jimmy Sanders
Description:
Installation of rooftop solar and a small parking structure 70.33KW DC/ 65.53KW AC 145 modules REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash. REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.

Permit Reviews

Permit Number - TC-COM-0124-00151
Permit Status: Inspections complete
Permit Description: Installation of rooftop solar and a small parking structure 70.33KW DC/ 65.53KW AC 145 modules REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash. REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Start Date Submittal Complete Date Status  
03/18/2026 COMMERCIAL REVIEW - FULL REVISION v.1 03/25/2026 APPROVED Review Details
04/28/2025 RESTAMP - COMMERCIAL v.1 04/29/2025 APPROVED Review Details
03/05/2024 COMMERCIAL REVIEW - FULL v.2 03/05/2024 REQUIRES RESUBMIT Review Details
07/22/2024 COMMERCIAL REVIEW - FULL v.4 08/08/2024 REQUIRES RESUBMIT Review Details
09/11/2025 COMMERCIAL REVIEW - FULL v.1 09/12/2025 REQUIRES RESUBMIT Review Details
04/08/2024 COMMERCIAL REVIEW - FULL v.3 05/09/2024 REQUIRES RESUBMIT Review Details
04/14/2025 COMMERCIAL REVIEW - FULL v.5 04/28/2025 APPROVED Review Details
01/24/2024 COMMERCIAL REVIEW - FULL v.1 02/26/2024 REQUIRES RESUBMIT Review Details
09/12/2025 COMMERCIAL REVIEW - FULL v.2 10/13/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0124-00151
Permit Status: Inspections complete
Permit Description: Installation of rooftop solar and a small parking structure 70.33KW DC/ 65.53KW AC 145 modules REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash. REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Date Description Comments
04/29/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00151
Permite Description: Installation of rooftop solar and a small parking structure 70.33KW DC/ 65.53KW AC 145 modules REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash. REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
02/12/2026 COT - CSOL - Electrical Progress Solar Project N/A Not Ready
02/12/2026 COT - LCBU - Building Final N/A Not Ready Provide a set of approved drawings prior to next inspection. 2/12/2026
02/12/2026 COT - CSOL - Electrical Underground Solar Project N/A Not Ready
02/12/2026 COT - CSOL - Grounding/Bonding Solar Project N/A Not Ready
02/12/2026 COT - LCBU - Framing N/A Not Ready Provide a set of approved drawings prior to next inspection. 2/12/2026
02/12/2026 COT - CSOL - Electrical Final Solar Project N/A Not Ready Provide a set of approved drawings prior to next inspection. 2/12/2026
02/12/2026 BULD - Electrical Clearance N/A Not Ready Provide a set of approved drawings prior to next inspection. 2/12/2026

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0124-00151
Permit Description: Installation of rooftop solar and a small parking structure 70.33KW DC/ 65.53KW AC 145 modules REV1: Change the inverter to Solis-S5. Change the RSD to RSD-S-PLC. Change the racking to dual rack lite rail with dual rack lite flash. REV2 (Delta I.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/11/2026 TRSP - ROW - Final/Close-Out Passed
02/11/2026 ENGR Engineering Final Passed
02/13/2026 COT - CSOL - Electrical Progress Solar Project Passed
02/13/2026 COT - LCBU - Building Final Passed
02/13/2026 COT - CSOL - Grounding/Bonding Solar Project Passed
03/26/2026 COT - CSOL - Electrical Final Solar Project Passed 03/26/2026
Approved clearance TEP DGC. Passed 2/13/26, required current approved plans to match listing DG meter panel.
03/26/2026 BULD - Electrical Clearance Passed 03/26/2026
Approved clearance TEP DGC. Passed 2/13/26, required current approved plans to match listing DG meter panel.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-CAMACHO 2 58.85KW - DRAFTING_I.1 (2) - RESEALED R5 - 17MAR2026-COMPRESSED_V1_V1.PDF DOCUMENTS VIEW
DOCUMENTS_V16_DRAWING-SET_REVISION LETTER_CAMACHO - DRAFTING _I.1 (2) (1)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CAMACHO 4420 - RESEALED R4 - 22AUG2025_V1.PDF DOCUMENTS VIEW
CAMACHO STRUCTURAL CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CAMACHO - DRAFTING _D.0 - (STAMPED)_V4.PDF DOCUMENTS VIEW
CONS-CAMACHO - PV STRUCTURAL CALCS (V3.9) RESPONSE LETTER_V3.PDF DOCUMENTS VIEW