Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2026 | BULD - Electrical Clearance | Not Ready | Provide a set of approved drawings prior to next inspection. 2/12/2026 | |
| 02/13/2026 | BULD - Electrical Clearance | Passed | 2/13/2026 clearance for TEP DGC/DGL. | |
| 03/26/2026 | BULD - Electrical Clearance | Passed | 03/26/2026 Approved clearance TEP DGC. Passed 2/13/26, required current approved plans to match listing DG meter panel. |
|
| 12/22/2025 | BULD - Electrical Clearance | Partial Pass | Partial pass. Secondary disconnect is tied into the line side of the main disconnect. Verbal clearance to TEP DGL. Okay to re energize the building. 12/22/2025 |