Permit Number: TC-COM-0124-00151
Parcel: 12007466A

Address:
4420 S 6TH AV

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0124-00151
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/09/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/17/2024 Commercial Electrical REQUIRES RESUBMIT Permit ELECTRICAL Review TC-COM-0124-00151 (4420 S 6TH AV TUCSON, AZ 85714)
2nd Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

>>> EE stamps were not on the latest submittal.
1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements.

>>> These comments were not addressed:

2. Correct the Conduit Fill Corrections per NEC 310.15(B)(3)(a). See sheet E-602, DC Wire Calculation table, Wire IDs 1, 3, 5.
3. Provide a Grounding Electrode System at the detached structure per NEC 690.47.
4. Show grounding details for the mounting equipment and metal support frame (New carport structure), NEC690.43.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
05/09/2024 Commercial Structural REQUIRES RESUBMIT Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed.
This comment from the first review was not addressed with this submittal:
2. Provide structural design, details, construction drawings and calculations for the new carport prepared by Arizona licensed registrant. IBC 107.2.1 Please address this comment with next submittal.

Mark Masek Plans Examiner Mark.masek@tucsonaz.gov 520-837-4994
05/07/2024 Site Engineering REQUIRES RESUBMIT See Zoning comment
05/06/2024 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-COM-0124-00151
4420 S 6TH AV - C-2
Installation of rooftop solar and a small parking structure (2nd Review)

TRANSMITTAL DATE:‎ May 6, 2024

This comment was not addressed. COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. This comment was not addressed. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building plan. The Administrative Manual can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes-and-Plans/Zoning-Code#section-1.

2. This comment was not addressed. There is currently a development package open on this site, DP21-0050. The DP will either need to be revised to show the proposed covered parking structure of withdrawn and a new DP started.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.
04/09/2024 Fire New Construction REVIEW COMPLETED
04/08/2024 PDSD Application Completeness Express REVIEW COMPLETED